Wood biomassOperatingERCOT

Nacogdoches Power

Wood biomass power plant in Nacogdoches County, Texas. 114 MW of nameplate capacity across 1 generator, operated by Austin Energy.

Also known as EIA plant 55708

Analyst: free account, 1 question a day.

Stryker CreekTenaska Gateway Generating StationOak Hill - Dry CreekAzalea Springs Solar ParkMartin LakeNacogdoches Power25 km
Open in the map
5 plants within 57 km, from EIA coordinates.

Key facts

Capacity
114 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2012First generator online
Operator
Austin EnergyEIA operator ID 1015
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Nacogdoches County, TX31.8321, −94.9006
EIA plant ID
55708EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Nacogdoches Power produces

Free · EIA-923

Net generation, 2025

251 GWh

250,745 MWh, final

Capacity factor, 2025

25.1%

2024: 19.0%

January to July 2026

227 GWh

Provisional

Range, 2015 to 2025

53.3–428.5

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201273,072Not reported7 of 12
201375,3877.5%12 of 12
2014128,33319.1%8 of 12
201592,1519.2%12 of 12
201698,6519.9%12 of 12
201782,9018.3%12 of 12
2018157,67315.8%12 of 12
201971,6467.2%12 of 12
202053,2585.3%12 of 12
2021161,06617.6%11 of 12
2022428,52842.9%12 of 12
2023249,85925.0%12 of 12
2024190,02819.0%12 of 12
2025250,74525.1%12 of 12
2026 (provisional, partial year)227,00439.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

388,202

US short tons. 2024: 303,342

SO₂, 2025

2

US short tons

NOx, 2025

144

US short tons

CO₂ per MWh, calculated

1.55 t

About 3,096 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (BFB-1), matched to EIA plant 55708 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

163

million gallons

Consumption, 2024

131

million gallons

Source

Lake Striker

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.244

USGS SUI, HUC12 Indian Creek-Angelina River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
STG4Wood/Wood Waste Biomass114.0June 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Austin Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Nacogdoches Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Nacogdoches Power

More plants operated by Austin Energy

Questions about Nacogdoches Power

How much power does Nacogdoches Power produce?

Nacogdoches Power reported 250,745 MWh (251 GWh) of net generation in 2025, a 25.1% capacity factor on 114 MW of nameplate capacity. From January to July 2026 it reported 227 GWh, which is provisional.

Where is Nacogdoches Power?

Nacogdoches Power is in Nacogdoches County, Texas, at 31.8321, −94.9006. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Nacogdoches Power?

EIA-860M for August 2026 lists Austin Energy as the operator (EIA operator ID 1015). The operator is not always the owner.

When did Nacogdoches Power start operating?

Its first generator began operating in June 2012, according to EIA-860M.

Does InfraMap have power prices for Nacogdoches Power?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Nacogdoches Power, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page