Natural gasOilOperatingERCOT

Stryker Creek

Natural gas power plant in Cherokee County, Texas. 713.4 MW of nameplate capacity across 7 generators, operated by Luminant Generation Company LLC.

Also known as Stryker Creek Power Plant · EIA plant 3504

Analyst: free account, 1 question a day.

Nacogdoches PowerTenaska Gateway Gener…Oak Hill - Dry CreekMartin LakeKnox LeeStryker Creek25 km
Open in the map
5 plants within 59 km, from EIA coordinates.

Key facts

Capacity
713.4 MWNatural gas 703.4 · Oil 10.0
Generators
7 operatingEIA-860M, August 2026
Operating since
June 1958First generator online
Operator
Luminant Generation Company LLCEIA operator ID 55983
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Cherokee County, TX31.9398, −94.9898
EIA plant ID
3504EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Stryker Creek produces

Free · EIA-923

Net generation, 2025

1.35 TWh

1,345,575 MWh, final

Capacity factor, 2025

21.5%

2024: 14.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

0.1–1.3

TWh a year. Low 2017, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,374,121Not reported12 of 12
20011,729,686Not reported12 of 12
20021,115,276Not reported12 of 12
2003347,583Not reported2 of 12
2004511,787Not reported12 of 12
2005481,008Not reported12 of 12
2006617,962Not reported12 of 12
2007781,390Not reported12 of 12
2008Not reportedNot reported0 of 12
2009587,305Not reported12 of 12
2010505,6848.1%12 of 12
2011301,3134.8%12 of 12
2012243,2333.9%12 of 12
2013168,8612.7%12 of 12
201459,8672.9%4 of 12
2015155,7703.0%10 of 12
2016129,8752.1%12 of 12
201776,1901.2%12 of 12
2018115,1301.8%12 of 12
2019253,1814.1%12 of 12
2020212,6393.4%12 of 12
2021307,9554.9%12 of 12
2022228,1813.7%12 of 12
20231,080,05917.3%12 of 12
2024921,74414.7%12 of 12
20251,345,57521.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

905,208

US short tons. 2024: 604,342

SO₂, 2025

5

US short tons

NOx, 2025

938

US short tons

CO₂ per MWh, calculated

0.67 t

About 1,345 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 3504 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

183,059

million gallons

Consumption, 2024

314

million gallons

Source

Stryker Creek Reservoir

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Low · 0.320

USGS SUI, HUC12 Sampson Creek-Striker Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
D1Petroleum Liquids2.0July 1966
D2Petroleum Liquids2.0July 1966
D3Petroleum Liquids2.0July 1966
D4Petroleum Liquids2.0July 1966
D5Petroleum Liquids2.0July 1966
ST1Natural Gas Steam Turbine176.8June 1958
ST2Natural Gas Steam Turbine526.6December 1965

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Luminant Generation Company LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Stryker Creek and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Stryker Creek

More plants operated by Luminant Generation Company LLC

Questions about Stryker Creek

How much power does Stryker Creek produce?

Stryker Creek reported 1,345,575 MWh (1.35 TWh) of net generation in 2025, a 21.5% capacity factor on 713.4 MW of nameplate capacity.

Where is Stryker Creek?

Stryker Creek is in Cherokee County, Texas, at 31.9399, −94.9898. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Stryker Creek?

EIA-860M for August 2026 lists Luminant Generation Company LLC as the operator (EIA operator ID 55983). The operator is not always the owner.

When did Stryker Creek start operating?

Its first generator began operating in June 1958, according to EIA-860M.

Does InfraMap have power prices for Stryker Creek?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to Stryker Creek, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page