Natural gasOperatingSPP

Knox Lee

Natural gas power plant in Gregg County, Texas. 351 MW of nameplate capacity across 1 generator, operated by Southwestern Electric Power Co.

Also known as Knox Lee Power Plant · EIA plant 3476

Analyst: free account, 1 question a day.

Eastman Cogeneration FacilityMartin LakeHarrison County Power…Oak Hill - Dry CreekSnider IndustriesTenaska Gateway Gener…Knox Lee20 km
Open in the map
6 plants within 40 km, from EIA coordinates.

Key facts

Capacity
351 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 1974First generator online
Operator
Southwestern Electric Power CoEIA operator ID 17698
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Gregg County, TX32.3766, −94.6415
EIA plant ID
3476EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Knox Lee produces

Free · EIA-923

Net generation, 2025

546 GWh

546,128 MWh, final

Capacity factor, 2025

17.8%

2024: 10.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

51.9–546.1

GWh a year. Low 2017, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,296,194Not reported12 of 12
20011,021,105Not reported12 of 12
2002618,463Not reported12 of 12
2003622,987Not reported12 of 12
2004430,106Not reported12 of 12
2005561,000Not reported12 of 12
2006533,649Not reported12 of 12
2007364,030Not reported12 of 12
2008299,479Not reported12 of 12
2009364,271Not reported12 of 12
2010421,1449.6%12 of 12
2011517,82014.2%10 of 12
2012608,49213.8%12 of 12
2013165,7225.6%8 of 12
2014134,3103.7%10 of 12
2015102,4872.3%12 of 12
2016136,8003.1%12 of 12
201751,8911.2%12 of 12
2018142,855Not reported12 of 12
2019107,8542.9%12 of 12
2020132,398Not reported12 of 12
2021185,1656.0%12 of 12
2022364,27911.8%12 of 12
20233,6111.4%1 of 12
2024321,25510.4%12 of 12
2025546,12817.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

353,424

US short tons. 2024: 212,257

SO₂, 2025

2

US short tons

NOx, 2025

370

US short tons

CO₂ per MWh, calculated

0.65 t

About 1,294 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (2, 3, 4, 5), matched to EIA plant 3476 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

89,339

million gallons

Consumption, 2024

110

million gallons

Source

LAKE CHEROKEE

Surface, Fresh. Once-through with cooling pond

Watershed stress

Low · 0.229

USGS SUI, HUC12 Lake Cherokee

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Natural Gas Steam Turbine351.0April 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southwestern Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Knox Lee and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Knox Lee

More plants operated by Southwestern Electric Power Co

Questions about Knox Lee

How much power does Knox Lee produce?

Knox Lee reported 546,128 MWh (546 GWh) of net generation in 2025, a 17.8% capacity factor on 351 MW of nameplate capacity.

Where is Knox Lee?

Knox Lee is in Gregg County, Texas, at 32.3766, −94.6415. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Knox Lee?

EIA-860M for August 2026 lists Southwestern Electric Power Co as the operator (EIA operator ID 17698). The operator is not always the owner.

When did Knox Lee start operating?

Its first generator began operating in April 1974, according to EIA-860M.

Does InfraMap have power prices for Knox Lee?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Knox Lee, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page