Natural gasOperatingERCOT

Robert Mueller Energy Center

Natural gas power plant in Travis County, Texas. 4.6 MW of nameplate capacity across 1 generator, operated by Austin Energy.

Also known as EIA plant 56374

Analyst: free account, 1 question a day.

Hal C Weaver Power PlantKingsberry Energy Storage SystemPowerFin KingsberyAustinAustin Gas RecoveryDecker CreekRobert Mueller5 km
Open in the map
6 plants within 9.1 km, from EIA coordinates.

Key facts

Capacity
4.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2006First generator online
Operator
Austin EnergyEIA operator ID 1015
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Travis County, TX30.3050, −97.7077
EIA plant ID
56374EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Robert Mueller produces

Free · EIA-923

Net generation, 2025

30.0 GWh

29,994 MWh, final

Capacity factor, 2025

56.1%

2024: 60.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

22.7–32.2

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
20061,309Not reported12 of 12
200718,062Not reported12 of 12
200812,272Not reported12 of 12
200916,998Not reported12 of 12
201023,70444.4%12 of 12
201124,97246.7%12 of 12
201229,07254.3%12 of 12
201327,80252.0%12 of 12
201426,99350.5%12 of 12
201527,66551.8%12 of 12
201628,31152.8%12 of 12
201728,60853.5%12 of 12
201828,76753.8%12 of 12
201927,55551.6%12 of 12
202027,06450.5%12 of 12
202123,57344.1%12 of 12
202227,67451.8%12 of 12
202322,74542.6%12 of 12
202432,18060.1%12 of 12
202529,99456.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combustion Turbine4.6July 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Austin Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Robert Mueller Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Robert Mueller

More plants operated by Austin Energy

Questions about Robert Mueller

How much power does Robert Mueller Energy Center produce?

Robert Mueller Energy Center reported 29,994 MWh (30.0 GWh) of net generation in 2025, a 56.1% capacity factor on 4.6 MW of nameplate capacity.

Where is Robert Mueller Energy Center?

Robert Mueller Energy Center is in Travis County, Texas, at 30.3050, −97.7077. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Robert Mueller Energy Center?

EIA-860M for August 2026 lists Austin Energy as the operator (EIA operator ID 1015). The operator is not always the owner.

When did Robert Mueller Energy Center start operating?

Its first generator began operating in July 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page