Natural gasOperatingCAISO

Los Esteros Critical Energy Center

Natural gas power plant in Santa Clara County, California. 306.1 MW of nameplate capacity across 5 generators, operated by Los Esteros Critical Energy Facility LLC.

Also known as Los Esteros Critical Energy Facility · EIA plant 55748

Analyst: free account, 1 question a day.

AT&T HolgerSJ/SC WPCPZero Waste Energy Development Co LLCCST001 McCarthy Fuel CellMaximLos Esteros Critical1 km
Open in the map
6 plants within 2.6 km, from EIA coordinates.

Key facts

Capacity
306.1 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
February 2003First generator online
Operator
Los Esteros Critical Energy Facility LLCEIA operator ID 2860
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Santa Clara County, CA37.4250, −121.9319
EIA plant ID
55748EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Los Esteros Critical produces

Free · EIA-923

Net generation, 2025

157 GWh

156,503 MWh, final

Capacity factor, 2025

5.8%

2024: 8.7%

January to July 2026

75.9 GWh

Provisional

Range, 2015 to 2025

153.9–356.4

GWh a year. Low 2016, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003158,379Not reported12 of 12
2004269,705Not reported12 of 12
2005266,614Not reported12 of 12
200678,190Not reported12 of 12
200765,704Not reported12 of 12
200875,383Not reported12 of 12
200973,689Not reported12 of 12
201039,5422.5%12 of 12
201166,5254.2%12 of 12
201200.0%12 of 12
2013297,482Not reported12 of 12
2014254,3829.5%12 of 12
2015351,57013.1%12 of 12
2016153,9335.7%12 of 12
2017225,5078.4%12 of 12
2018356,43113.3%12 of 12
2019215,5528.0%12 of 12
2020273,19610.2%12 of 12
2021303,11311.3%12 of 12
2022180,0996.7%12 of 12
2023179,5396.7%12 of 12
2024233,3188.7%12 of 12
2025156,5035.8%12 of 12
2026 (provisional, partial year)75,8994.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

83,314

US short tons. 2024: 123,859

SO₂, 2025

0

US short tons

NOx, 2025

5

US short tons

CO₂ per MWh, calculated

0.53 t

About 1,065 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (CTG1, CTG2, CTG3, CTG4), matched to EIA plant 55748 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

87

million gallons

Consumption, 2024

72

million gallons

Source

City of San Jose Municipal

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Low · 0.360

USGS SUI, HUC12 San Jose State University-Frontal San Francisco Bay Estuaries

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CAG5Natural Gas Fired Combined Cycle126.1August 2013
CTG1Natural Gas Fired Combined Cycle45.0February 2003
CTG2Natural Gas Fired Combined Cycle45.0February 2003
CTG3Natural Gas Fired Combined Cycle45.0February 2003
CTG4Natural Gas Fired Combined Cycle45.0February 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Esteros Critical Energy Facility LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Los Esteros Critical Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Los Esteros Critical

Questions about Los Esteros Critical

How much power does Los Esteros Critical Energy Center produce?

Los Esteros Critical Energy Center reported 156,503 MWh (157 GWh) of net generation in 2025, a 5.8% capacity factor on 306.1 MW of nameplate capacity. From January to July 2026 it reported 75.9 GWh, which is provisional.

Where is Los Esteros Critical Energy Center?

Los Esteros Critical Energy Center is in Santa Clara County, California, at 37.4250, −121.9319. It is in the California Independent System Operator balancing area (CISO).

Who operates Los Esteros Critical Energy Center?

EIA-860M for August 2026 lists Los Esteros Critical Energy Facility LLC as the operator (EIA operator ID 2860). The operator is not always the owner.

When did Los Esteros Critical Energy Center start operating?

Its first generator began operating in February 2003, according to EIA-860M.

Does InfraMap have power prices for Los Esteros Critical Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Los Esteros Critical Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page