Natural gasOperatingCAISO

SJ/SC WPCP

Natural gas power plant in Santa Clara County, California. 14 MW of nameplate capacity across 4 generators, operated by San Jose/Santa Clara Water P C.

Also known as EIA plant 56080

Analyst: free account, 1 question a day.

Zero Waste Energy Dev…Los Esteros Critical Energy CenterAT&T HolgerMaximSJ/SC WPCP2 km
Open in the map
6 plants within 4.1 km, from EIA coordinates.

Key facts

Capacity
14 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
October 2020First generator online
Operator
San Jose/Santa Clara Water P CEIA operator ID 16657
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Santa Clara County, CA37.4344, −121.9464
EIA plant ID
56080EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power SJ/SC WPCP produces

Free · EIA-923

Net generation, 2025

83.0 GWh

82,967 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

33.8 GWh

Provisional. 6 of 7 months reported

Range, 2015 to 2025

32.0–83.0

GWh a year. Low 2016, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200347,061Not reported12 of 12
20040Not reported12 of 12
200558,911Not reported12 of 12
200656,035Not reported12 of 12
200750,244Not reported12 of 12
200847,660Not reported12 of 12
200943,530Not reported12 of 12
201040,80439.5%12 of 12
201142,35941.0%12 of 12
201236,81135.5%12 of 12
201364,35162.3%12 of 12
201432,81031.7%12 of 12
201543,010Not reported12 of 12
201632,03933.2%12 of 12
20175,185Not reported2 of 12
201832,55144.2%12 of 12
201940,46955.0%12 of 12
202040,743Not reported12 of 12
202161,014Not reported12 of 12
202262,25950.8%12 of 12
202371,57663.6%11 of 12
202482,238Not reported12 of 12
202582,967Not reported12 of 12
2026 (provisional, partial year)33,842Not reported6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
EG4Natural Gas Internal Combustion Engine3.5October 2020
EG5Natural Gas Internal Combustion Engine3.5October 2020
EG6Natural Gas Internal Combustion Engine3.5October 2020
EG7Natural Gas Internal Combustion Engine3.5October 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists San Jose/Santa Clara Water P C as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query SJ/SC WPCP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near SJ/SC WPCP

Questions about SJ/SC WPCP

How much power does SJ/SC WPCP produce?

SJ/SC WPCP reported 82,967 MWh (83.0 GWh) of net generation in 2025. From January to July 2026 it reported 33.8 GWh, which is provisional.

Where is SJ/SC WPCP?

SJ/SC WPCP is in Santa Clara County, California, at 37.4344, −121.9464. It is in the California Independent System Operator balancing area (CISO).

Who operates SJ/SC WPCP?

EIA-860M for August 2026 lists San Jose/Santa Clara Water P C as the operator (EIA operator ID 16657). The operator is not always the owner.

When did SJ/SC WPCP start operating?

Its first generator began operating in October 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page