Natural gasOperatingCAISO

Tracy Combined Cycle Power Plant

Natural gas power plant in San Joaquin County, California. 336.1 MW of nameplate capacity across 3 generators, operated by MRP San Joaquin Energy LLC..

Also known as EIA plant 55933

Analyst: free account, 1 question a day.

Foundation STMedline Ind. Phase 2 TracyTracy 210Prologis L.PTracy Combined Cycle2 km
Open in the map
6 plants within 5.2 km, from EIA coordinates.

Key facts

Capacity
336.1 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
April 2003First generator online
Operator
MRP San Joaquin Energy LLC.EIA operator ID 7724
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Joaquin County, CA37.7107, −121.4906
EIA plant ID
55933EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tracy Combined Cycle produces

Free · EIA-923

Net generation, 2025

896 GWh

896,191 MWh, final

Capacity factor, 2025

30.4%

2024: 33.9%

January to July 2026

197 GWh

Provisional

Range, 2015 to 2025

0.3–1.0

TWh a year. Low 2016, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200310,460Not reported7 of 12
200411,367Not reported12 of 12
20059,788Not reported12 of 12
200615,949Not reported12 of 12
200713,708Not reported12 of 12
200811,302Not reported12 of 12
200921,242Not reported12 of 12
20107,1470.5%12 of 12
201115,0161.0%12 of 12
2012141,970Not reported6 of 12
2013610,541Not reported12 of 12
2014642,71521.8%12 of 12
2015763,34525.9%12 of 12
2016326,41811.1%12 of 12
2017879,33429.9%12 of 12
2018868,38329.5%12 of 12
2019864,40229.4%12 of 12
2020702,69823.8%12 of 12
2021802,66327.3%12 of 12
2022370,67812.6%12 of 12
2023815,78927.7%12 of 12
20241,000,45433.9%12 of 12
2025896,19130.4%12 of 12
2026 (provisional, partial year)196,95211.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

453,079

US short tons. 2024: 506,628

SO₂, 2025

2

US short tons

NOx, 2025

48

US short tons

CO₂ per MWh, calculated

0.51 t

About 1,011 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (TPP1, TPP2), matched to EIA plant 55933 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

High · 0.784

USGS SUI, HUC12 Lower Old River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TCC1Natural Gas Fired Combined Cycle167.3July 2012
TPP1Natural Gas Fired Combined Cycle84.4April 2003
TPP2Natural Gas Fired Combined Cycle84.4April 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MRP San Joaquin Energy LLC. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tracy Combined Cycle Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tracy Combined Cycle

More plants operated by MRP San Joaquin Energy LLC.

Questions about Tracy Combined Cycle

How much power does Tracy Combined Cycle Power Plant produce?

Tracy Combined Cycle Power Plant reported 896,191 MWh (896 GWh) of net generation in 2025, a 30.4% capacity factor on 336.1 MW of nameplate capacity. From January to July 2026 it reported 197 GWh, which is provisional.

Where is Tracy Combined Cycle Power Plant?

Tracy Combined Cycle Power Plant is in San Joaquin County, California, at 37.7107, −121.4906. It is in the California Independent System Operator balancing area (CISO).

Who operates Tracy Combined Cycle Power Plant?

EIA-860M for August 2026 lists MRP San Joaquin Energy LLC. as the operator (EIA operator ID 7724). The operator is not always the owner.

When did Tracy Combined Cycle Power Plant start operating?

Its first generator began operating in April 2003, according to EIA-860M.

Does InfraMap have power prices for Tracy Combined Cycle Power Plant?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Tracy Combined Cycle Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page