Natural gasOperatingCAISO

Henrietta Peaker

Natural gas power plant in Kings County, California. 98 MW of nameplate capacity across 2 generators, operated by MRP San Joaquin Energy LLC..

Also known as Henrietta Peaker power plant · EIA plant 55807

Analyst: free account, 1 question a day.

American Kings Solar, LLCHenrietta D Energy Storage LLCRE Kent South, LLCSlate HybridRE Mustang LLCHenrietta Peaker1 km
Open in the map
6 plants within 2.0 km, from EIA coordinates.

Key facts

Capacity
98 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2002First generator online
Operator
MRP San Joaquin Energy LLC.EIA operator ID 7724
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Kings County, CA36.2397, −119.9044
EIA plant ID
55807EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Henrietta Peaker produces

Free · EIA-923

Net generation, 2025

3.77 GWh

3,772 MWh, final

Capacity factor, 2025

0.4%

2024: 1.1%

January to July 2026

1.99 GWh

Provisional

Range, 2015 to 2025

3.5–98.8

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200232,808Not reported7 of 12
200319,698Not reported12 of 12
200410,984Not reported12 of 12
200513,038Not reported12 of 12
200619,223Not reported12 of 12
200721,012Not reported12 of 12
200848,062Not reported12 of 12
200955,230Not reported12 of 12
201015,8271.8%12 of 12
201115,9431.9%12 of 12
201238,7374.5%12 of 12
201354,0886.3%12 of 12
201498,22811.4%12 of 12
201598,82711.5%12 of 12
201632,5223.8%12 of 12
201738,5084.5%12 of 12
201832,9033.8%12 of 12
201930,5353.6%12 of 12
202030,3083.5%12 of 12
202124,9592.9%12 of 12
202248,6765.7%12 of 12
20233,5360.4%12 of 12
20249,8051.1%12 of 12
20253,7720.4%12 of 12
2026 (provisional, partial year)1,9860.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2,216

US short tons. 2024: 5,887

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

0.59 t

About 1,175 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (HPP1, HPP2), matched to EIA plant 55807 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HPP1Natural Gas Fired Combustion Turbine49.0June 2002
HPP2Natural Gas Fired Combustion Turbine49.0June 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MRP San Joaquin Energy LLC. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Henrietta Peaker and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Henrietta Peaker

More plants operated by MRP San Joaquin Energy LLC.

Questions about Henrietta Peaker

How much power does Henrietta Peaker produce?

Henrietta Peaker reported 3,772 MWh (3.77 GWh) of net generation in 2025, a 0.4% capacity factor on 98 MW of nameplate capacity. From January to July 2026 it reported 1.99 GWh, which is provisional.

Where is Henrietta Peaker?

Henrietta Peaker is in Kings County, California, at 36.2397, −119.9044. It is in the California Independent System Operator balancing area (CISO).

Who operates Henrietta Peaker?

EIA-860M for August 2026 lists MRP San Joaquin Energy LLC. as the operator (EIA operator ID 7724). The operator is not always the owner.

When did Henrietta Peaker start operating?

Its first generator began operating in June 2002, according to EIA-860M.

Does InfraMap have power prices for Henrietta Peaker?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Henrietta Peaker, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page