RE Mustang LLC
Solar and battery storage project in Kings County, California. 175 MW of nameplate capacity across 2 generators, operated by MN8 Energy LLC.
Also known as RE Mustang Solar Project · RE Mustang, LLC · EIA plant 59150
This project groups RE Mustang LLC (EIA 59150). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 175 MWSolar 100.0 · Battery storage 75.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- August 2016First generator online
- Operator
- MN8 Energy LLCEIA operator ID 61944
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 4 CAISO nodesResource nodes with prices
- Location
- Kings County, CA36.2217, −119.9031
- EIA plant ID
- 59150EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power RE Mustang produces
Free · EIA-923Net generation, 2025
221 GWh
220,754 MWh, final
Capacity factor, 2025
26.7%
2024: 26.7%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2017 to 2025
149.9–264.8
GWh a year. Low 2023, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | 211,657 | 23.8% | 10 of 12 |
| 2017 | 264,833 | 30.2% | 12 of 12 |
| 2018 | 259,071 | 29.6% | 12 of 12 |
| 2019 | 247,175 | 28.2% | 12 of 12 |
| 2020 | 231,275 | 26.3% | 12 of 12 |
| 2021 | 33,749 | Not reported | 3 of 12 |
| 2022 | 202,806 | 24.9% | 12 of 12 |
| 2023 | 149,940 | 18.5% | 12 of 12 |
| 2024 | 220,550 | 26.7% | 12 of 12 |
| 2025 | 220,754 | 26.7% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BESS1 | Batteries | 75.0 | October 2021 |
| PV1 | Solar Photovoltaic | 100.0 | August 2016 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MN8 Energy LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query RE Mustang LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near RE Mustang
More plants operated by MN8 Energy LLC
Questions about RE Mustang
How much power does RE Mustang LLC produce?
RE Mustang LLC reported 220,754 MWh (221 GWh) of net generation in 2025, a 26.7% capacity factor on 175 MW of nameplate capacity.
Where is RE Mustang LLC?
RE Mustang LLC is in Kings County, California, at 36.2217, −119.9031. It is in the California Independent System Operator balancing area (CISO).
Who operates RE Mustang LLC?
EIA-860M for August 2026 lists MN8 Energy LLC as the operator (EIA operator ID 61944). The operator is not always the owner.
Is RE Mustang LLC a solar or a battery storage plant?
Both. Solar capacity totals 100 MW and battery storage capacity totals 75 MW.
When did RE Mustang LLC start operating?
Its first generator began operating in August 2016, according to EIA-860M.
Does InfraMap have power prices for RE Mustang LLC?
Yes. InfraMap has CAISO day-ahead and real-time prices at 4 price nodes linked to RE Mustang LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)