Hudson - High Desert Hybrid
Solar and battery storage project in San Bernardino County, California. 150 MW of nameplate capacity across 2 generators, operated by MN8 Energy LLC.
Also known as High Desert Hybrid Solar Farm · Hudson-High Desert Hybrid · EIA plant 64624
This project groups Hudson - High Desert Hybrid (EIA 64624). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 150 MWSolar 100.0 · Battery storage 50.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- December 2021First generator online
- Operator
- MN8 Energy LLCEIA operator ID 61944
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 2 CAISO nodesResource nodes with prices
- Location
- San Bernardino County, CA34.6365, −117.3724
- EIA plant ID
- 64624EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Hudson - High Desert Hybrid produces
Free · EIA-923Net generation, 2025
289 GWh
288,956 MWh, final
Capacity factor, 2025
34.0%
2024: 33.1%
January to July 2026
179 GWh
Provisional
Range, 2022 to 2025
277.1–289.0
GWh a year. Low 2023, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 12,885 | Not reported | 1 of 12 |
| 2022 | 280,828 | 32.9% | 12 of 12 |
| 2023 | 277,143 | 32.5% | 12 of 12 |
| 2024 | 283,728 | 33.1% | 12 of 12 |
| 2025 | 288,956 | 34.0% | 12 of 12 |
| 2026 (provisional, partial year) | 179,033 | 36.2% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BESS1 | Batteries | 50.0 | December 2021 |
| GEN1 | Solar Photovoltaic | 100.0 | December 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MN8 Energy LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Hudson - High Desert Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Hudson - High Desert Hybrid
More plants operated by MN8 Energy LLC
Questions about Hudson - High Desert Hybrid
How much power does Hudson - High Desert Hybrid produce?
Hudson - High Desert Hybrid reported 288,956 MWh (289 GWh) of net generation in 2025, a 34.0% capacity factor on 150 MW of nameplate capacity. From January to July 2026 it reported 179 GWh, which is provisional.
Where is Hudson - High Desert Hybrid?
Hudson - High Desert Hybrid is in San Bernardino County, California, at 34.6365, −117.3724. It is in the California Independent System Operator balancing area (CISO).
Who operates Hudson - High Desert Hybrid?
EIA-860M for August 2026 lists MN8 Energy LLC as the operator (EIA operator ID 61944). The operator is not always the owner.
Is Hudson - High Desert Hybrid a solar or a battery storage plant?
Both. Solar capacity totals 100 MW and battery storage capacity totals 50 MW.
When did Hudson - High Desert Hybrid start operating?
Its first generator began operating in December 2021, according to EIA-860M.
Does InfraMap have power prices for Hudson - High Desert Hybrid?
Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Hudson - High Desert Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page