Natural gasOperatingSOCO

AMEA Peaking

Natural gas power plant in Talladega County, Alabama. 98.6 MW of nameplate capacity across 2 generators, operated by Alabama Municipal Elec Authority - (AL).

Also known as AMEA Peaking Gas Power Plant · EIA plant 56018

Analyst: free account, 1 question a day.

E C GastonU S Alliance Coosa PinesLogan Martin DamLay DamHillabee Energy CenterMitchell DamAMEA Peaking25 km
Open in the map
6 plants within 43 km, from EIA coordinates.

Key facts

Capacity
98.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2004First generator online
Operator
Alabama Municipal Elec Authority - (AL)EIA operator ID 40614
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Talladega County, AL33.1661, −86.2825
EIA plant ID
56018EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power AMEA Peaking produces

Free · EIA-923

Net generation, 2025

48.5 GWh

48,529 MWh, final

Capacity factor, 2025

5.6%

2024: 4.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

25.6–104.0

GWh a year. Low 2017, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
20059,101Not reported12 of 12
200628,810Not reported12 of 12
200725,105Not reported12 of 12
20087,829Not reported12 of 12
20095,177Not reported12 of 12
201012,6421.5%12 of 12
20119,4231.1%12 of 12
20128,1830.9%12 of 12
20139820.1%12 of 12
201429,3783.4%12 of 12
201561,4937.1%12 of 12
201646,2425.3%12 of 12
201725,6103.0%12 of 12
201834,5704.0%12 of 12
201953,7196.2%12 of 12
202041,9254.8%12 of 12
202151,7776.0%12 of 12
2022104,01712.0%12 of 12
202346,3005.4%12 of 12
202435,2024.1%12 of 12
202548,5295.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

28,509

US short tons. 2024: 20,772

SO₂, 2025

0

US short tons

NOx, 2025

21

US short tons

CO₂ per MWh, calculated

0.59 t

About 1,175 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 56018 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine49.3May 2004
2Natural Gas Fired Combustion Turbine49.3May 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Municipal Elec Authority - (AL) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query AMEA Peaking and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near AMEA Peaking

Questions about AMEA Peaking

How much power does AMEA Peaking produce?

AMEA Peaking reported 48,529 MWh (48.5 GWh) of net generation in 2025, a 5.6% capacity factor on 98.6 MW of nameplate capacity.

Where is AMEA Peaking?

AMEA Peaking is in Talladega County, Alabama, at 33.1661, −86.2825. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates AMEA Peaking?

EIA-860M for August 2026 lists Alabama Municipal Elec Authority - (AL) as the operator (EIA operator ID 40614). The operator is not always the owner.

When did AMEA Peaking start operating?

Its first generator began operating in May 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page