Natural gasCoalOilOperatingSOCO

E C Gaston

Natural gas and coal power plant in Shelby County, Alabama. 2,034 MW of nameplate capacity across 6 generators, operated by Alabama Power Co.

Also known as Earnest C Gaston Steam Plant · E.C. Gaston · EC Gaston · EIA plant 26

Analyst: free account, 1 question a day.

U S Alliance Coosa PinesAMEA PeakingLogan Martin DamLay DamABC CokeMitchell DamE C Gaston25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
2,034 MWNatural gas 1,060.8 · Coal 952.0 · Oil 21.2
Generators
6 operatingEIA-860M, August 2026
Operating since
May 1960First generator online
Operator
Alabama Power CoEIA operator ID 195
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Shelby County, AL33.2442, −86.4581
EIA plant ID
26EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power E C Gaston produces

Free · EIA-923

Net generation, 2025

3.81 TWh

3,808,595 MWh, final

Capacity factor, 2025

21.4%

2024: 18.4%

January to July 2026

1.91 TWh

Provisional

Range, 2015 to 2025

3.3–6.6

TWh a year. Low 2024, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200012,623,222Not reported12 of 12
200112,528,720Not reported12 of 12
200212,663,329Not reported12 of 12
200310,754,282Not reported10 of 12
200412,330,640Not reported12 of 12
200511,273,347Not reported12 of 12
200611,389,703Not reported12 of 12
2007Not reportedNot reported0 of 12
200811,411,360Not reported12 of 12
20098,033,763Not reported12 of 12
20109,593,17053.8%12 of 12
201111,284,03463.3%12 of 12
20128,135,03345.5%12 of 12
20137,011,76739.4%12 of 12
2014744,88349.2%1 of 12
20156,578,898Not reported12 of 12
201669,773Not reported1 of 12
20174,916,601Not reported12 of 12
20186,087,254Not reported12 of 12
20195,688,93031.9%12 of 12
20203,796,94521.3%12 of 12
20214,335,97824.3%12 of 12
20224,044,92322.7%12 of 12
20233,399,76519.1%12 of 12
20243,281,09918.4%12 of 12
20253,808,59521.4%12 of 12
2026 (provisional, partial year)1,912,00118.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

3.55M

US short tons. 2024: 3.14M

SO₂, 2025

940

US short tons

NOx, 2025

2,178

US short tons

CO₂ per MWh, calculated

0.93 t

About 1,867 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5), matched to EIA plant 26 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

440,323

million gallons

Consumption, 2024

2,004

million gallons

Source

Coosa River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.145

USGS SUI, HUC12 Hay Spring Branch-Coosa River

24 of 24 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine272.0May 1960
2Natural Gas Steam Turbine272.0July 1960
3Natural Gas Steam Turbine272.0June 1961
5Conventional Steam Coal952.0August 1974
GT4Petroleum Liquids21.2June 1970
ST4Natural Gas Steam Turbine244.8June 1962

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query E C Gaston and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near E C Gaston

More plants operated by Alabama Power Co

Questions about E C Gaston

How much power does E C Gaston produce?

E C Gaston reported 3,808,595 MWh (3.81 TWh) of net generation in 2025, a 21.4% capacity factor on 2,034 MW of nameplate capacity. From January to July 2026 it reported 1.91 TWh, which is provisional.

Where is E C Gaston?

E C Gaston is in Shelby County, Alabama, at 33.2442, −86.4581. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates E C Gaston?

EIA-860M for August 2026 lists Alabama Power Co as the operator (EIA operator ID 195). The operator is not always the owner.

Is E C Gaston a natural gas or a coal plant?

Both. Natural gas capacity totals 1,060.8 MW and coal capacity totals 952 MW, with 21.2 MW of oil.

When did E C Gaston start operating?

Its first generator began operating in May 1960, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page