Natural gasCoalOperatingSOCO

Barry

Natural gas and coal power plant in Mobile County, Alabama. 3,343.5 MW of nameplate capacity across 12 generators, operated by Alabama Power Co.

Also known as Barry Electric Generating Plant · EIA plant 3

Analyst: free account, 1 question a day.

McIntosh (AL)Washington County Cog…Hog Bayou Energy CenterKimberly Clark Mobile…Lowman Energy CenterBarry25 km
Open in the map
6 plants within 55 km, from EIA coordinates.

Key facts

Capacity
3,343.5 MWNatural gas 2,151.0 · Coal 1,192.5
Generators
12 operatingEIA-860M, August 2026
Operating since
February 1954First generator online
Operator
Alabama Power CoEIA operator ID 195
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Mobile County, AL31.0069, −88.0103
EIA plant ID
3EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Barry produces

Free · EIA-923

Net generation, 2025

12.5 TWh

12,486,289 MWh, final. 11 of 12 months reported

Capacity factor, 2025

46.4%

2024: 47.9%

January to July 2026

8.17 TWh

Provisional

Range, 2015 to 2024

11.4–14.1

TWh a year. Low 2015, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200012,348,987Not reported12 of 12
200115,798,765Not reported12 of 12
200216,941,194Not reported12 of 12
200314,816,364Not reported12 of 12
200414,435,331Not reported12 of 12
200514,601,276Not reported12 of 12
200614,639,481Not reported12 of 12
200715,152,333Not reported12 of 12
20081,222,788Not reported1 of 12
20091,002,868Not reported1 of 12
2010Not reportedNot reported0 of 12
20111,073,82050.8%1 of 12
201213,262,52953.1%12 of 12
201312,897,13751.8%12 of 12
20141,205,24657.0%1 of 12
201511,387,562Not reported12 of 12
201612,770,89156.6%12 of 12
201711,864,55452.7%12 of 12
2018Not reportedNot reported0 of 12
201912,470,80755.4%12 of 12
202010,499,14650.8%11 of 12
202111,792,28652.4%12 of 12
202211,894,41952.8%12 of 12
20238,675,796Not reported11 of 12
202414,055,86947.9%12 of 12
202512,486,28946.4%11 of 12
2026 (provisional, partial year)8,171,46648.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

6.34M

US short tons. 2024: 6.44M

SO₂, 2025

190

US short tons

NOx, 2025

890

US short tons

9 of 9 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6A, 6B, 7A, and others), matched to EIA plant 3 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

114,443

million gallons

Consumption, 2024

1,632

million gallons

Source

Mobile River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.152

USGS SUI, HUC12 Big Chippewa Lake-Mobile River

16 of 60 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine153.1February 1954
2Natural Gas Steam Turbine153.1July 1954
4Conventional Steam Coal403.7December 1969
5Conventional Steam Coal788.8October 1971
A1CTNatural Gas Fired Combined Cycle170.1May 2000
A1CT2Natural Gas Fired Combined Cycle170.1May 2000
A1STNatural Gas Fired Combined Cycle195.2May 2000
A2C1Natural Gas Fired Combined Cycle170.1May 2000
A2C2Natural Gas Fired Combined Cycle170.1May 2000
A2STNatural Gas Fired Combined Cycle195.2May 2000
A3C1Natural Gas Fired Combined Cycle464.0November 2023
A3STNatural Gas Fired Combined Cycle310.0November 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Barry and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Barry

More plants operated by Alabama Power Co

Questions about Barry

How much power does Barry produce?

Barry reported 12,486,289 MWh (12.5 TWh) of net generation in 2025, a 46.4% capacity factor on 3,343.5 MW of nameplate capacity. From January to July 2026 it reported 8.17 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Barry?

Barry is in Mobile County, Alabama, at 31.0069, −88.0103. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Barry?

EIA-860M for August 2026 lists Alabama Power Co as the operator (EIA operator ID 195). The operator is not always the owner.

Is Barry a natural gas or a coal plant?

Both. Natural gas capacity totals 2,151 MW and coal capacity totals 1,192.5 MW.

When did Barry start operating?

Its first generator began operating in February 1954, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page