Key facts

Capacity
939.4 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
May 2002First generator online
Operator
Alabama Power CoEIA operator ID 195
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Autauga County, AL32.6514, −86.7386
EIA plant ID
55271EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tenaska Lindsay Hill produces

Free · EIA-923

Net generation, 2025

1.53 TWh

1,532,284 MWh, final

Capacity factor, 2025

18.6%

2024: 21.2%

January to July 2026

597 GWh

Provisional

Range, 2015 to 2025

1.1–4.2

TWh a year. Low 2017, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20021,325,010Not reported8 of 12
2003173,896Not reported11 of 12
2004701,026Not reported12 of 12
2005573,906Not reported12 of 12
2006980,562Not reported12 of 12
2007908,517Not reported12 of 12
2008180,532Not reported6 of 12
2009606,590Not reported12 of 12
2010910,92511.1%12 of 12
20111,655,26020.1%12 of 12
20122,937,78835.6%12 of 12
20133,203,739Not reported12 of 12
20142,703,29348.9%8 of 12
20154,218,85151.3%12 of 12
20162,905,51735.2%12 of 12
20171,112,55913.5%12 of 12
20181,882,85922.9%12 of 12
20191,723,98520.9%12 of 12
20201,825,39322.1%12 of 12
20211,887,34122.9%12 of 12
20223,013,18836.6%12 of 12
20232,712,17033.0%12 of 12
20241,752,21721.2%12 of 12
20251,532,28418.6%12 of 12
2026 (provisional, partial year)597,24112.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

699,128

US short tons. 2024: Not reported

SO₂, 2025

4

US short tons

NOx, 2025

52

US short tons

CO₂ per MWh, calculated

0.46 t

About 913 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (CT1, CT2, CT3), matched to EIA plant 55271 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

374

million gallons

Consumption, 2024

346

million gallons

Source

Alabama River

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.260

USGS SUI, HUC12 Upper Little Mulberry Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GTG1Natural Gas Fired Combined Cycle183.1May 2002
GTG2Natural Gas Fired Combined Cycle183.1May 2002
GTG3Natural Gas Fired Combined Cycle183.1May 2002
STG1Natural Gas Fired Combined Cycle390.1May 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tenaska Lindsay Hill Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tenaska Lindsay Hill

More plants operated by Alabama Power Co

Questions about Tenaska Lindsay Hill

How much power does Tenaska Lindsay Hill Generating Station produce?

Tenaska Lindsay Hill Generating Station reported 1,532,284 MWh (1.53 TWh) of net generation in 2025, a 18.6% capacity factor on 939.4 MW of nameplate capacity. From January to July 2026 it reported 597 GWh, which is provisional.

Where is Tenaska Lindsay Hill Generating Station?

Tenaska Lindsay Hill Generating Station is in Autauga County, Alabama, at 32.6514, −86.7386. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Tenaska Lindsay Hill Generating Station?

EIA-860M for August 2026 lists Alabama Power Co as the operator (EIA operator ID 195). The operator is not always the owner.

When did Tenaska Lindsay Hill Generating Station start operating?

Its first generator began operating in May 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values