Natural gasOperatingSOCO

Greene County

Natural gas power plant in Greene County, Alabama. 1,288.4 MW of nameplate capacity across 11 generators, operated by Alabama Power Co.

Also known as Greene County Electric Generating Plant · EIA plant 10

Analyst: free account, 1 question a day.

WestRock Demopolis MillGeorgia-Pacific Consr Prods LP-NaheolaGreene County25 km
Open in the map
2 plants within 48 km, from EIA coordinates.

Key facts

Capacity
1,288.4 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
June 1965First generator online
Operator
Alabama Power CoEIA operator ID 195
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Greene County, AL32.6017, −87.7811
EIA plant ID
10EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Greene County produces

Free · EIA-923

Net generation, 2025

Not reported

Not reported MWh, final. 0 of 12 months reported

Capacity factor, 2025

Not reported

2024: 13.2%

January to July 2026

445 GWh

Provisional

Range, 2015 to 2024

0.8–2.2

TWh a year. Low 2021, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20004,494,641Not reported12 of 12
20014,105,758Not reported12 of 12
20023,940,228Not reported12 of 12
20033,757,177Not reported12 of 12
20043,716,866Not reported12 of 12
20053,912,748Not reported12 of 12
20063,987,948Not reported12 of 12
20073,982,941Not reported12 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
20102,783,91024.7%12 of 12
20112,475,75721.9%12 of 12
20122,095,10118.5%12 of 12
20132,499,06922.1%12 of 12
2014286,89529.9%1 of 12
20152,249,28519.9%12 of 12
2016Not reportedNot reported0 of 12
2017827,1408.0%11 of 12
201872,4637.6%1 of 12
20191,767,88915.7%12 of 12
20201,071,1429.5%12 of 12
2021750,4206.6%12 of 12
20221,238,22011.0%12 of 12
20231,396,26012.4%12 of 12
20241,489,02713.2%12 of 12
2025Not reportedNot reported0 of 12
2026 (provisional, partial year)444,9746.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

700,210

US short tons. 2024: 960,110

SO₂, 2025

4

US short tons

NOx, 2025

828

US short tons

11 of 11 EPA units reported CO₂ in 2025 (1, 2, CT10, CT2, CT3, CT4, CT5, CT6, and others), matched to EIA plant 10 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

122,976

million gallons

Consumption, 2024

0

million gallons

Source

Black Warrior River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.166

USGS SUI, HUC12 French Creek-Black Warrior River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine299.2June 1965
2Natural Gas Steam Turbine269.2July 1966
GT2Natural Gas Fired Combustion Turbine80.0May 1996
GT3Natural Gas Fired Combustion Turbine80.0May 1995
GT4Natural Gas Fired Combustion Turbine80.0May 1995
GT5Natural Gas Fired Combustion Turbine80.0May 1995
GT6Natural Gas Fired Combustion Turbine80.0May 1995
GT7Natural Gas Fired Combustion Turbine80.0May 1995
GT8Natural Gas Fired Combustion Turbine80.0May 1996
GT9Natural Gas Fired Combustion Turbine80.0May 1996
GT10Natural Gas Fired Combustion Turbine80.0May 1996

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Greene County and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Greene County

More plants operated by Alabama Power Co

Questions about Greene County

Where is Greene County?

Greene County is in Greene County, Alabama, at 32.6017, −87.7811. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Greene County?

EIA-860M for August 2026 lists Alabama Power Co as the operator (EIA operator ID 195). The operator is not always the owner.

When did Greene County start operating?

Its first generator began operating in June 1965, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page