Wood biomassOperatingSOCO

U S Alliance Coosa Pines

Wood biomass power plant in Talladega County, Alabama. 25.9 MW of nameplate capacity across 1 generator, operated by Bowater Newport Coosa Pines Op.

Also known as U S Alliance Coosa Pines Cogen · U.S. Alliance Coosa Pines · US Alliance Coosa Pines · EIA plant 54216

Analyst: free account, 1 question a day.

Logan Martin DamE C GastonAMEA PeakingLay DamCalhoun Energy CenterABC CokeU S Alliance Coosa Pines25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
25.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2007First generator online
Operator
Bowater Newport Coosa Pines OpEIA operator ID 2053
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Talladega County, AL33.3281, −86.3568
EIA plant ID
54216EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power U S Alliance Coosa Pines produces

Free · EIA-923

Net generation, 2025

120 GWh

119,707 MWh, final

Capacity factor, 2025

52.8%

2024: 62.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

119.7–155.0

GWh a year. Low 2025, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001264,363Not reported12 of 12
2002161,268Not reported12 of 12
2003173,254Not reported12 of 12
2004160,845Not reported12 of 12
2005142,488Not reported12 of 12
2006156,694Not reported12 of 12
2007128,026Not reported12 of 12
2008117,522Not reported12 of 12
2009144,493Not reported12 of 12
2010154,35758.0%12 of 12
2011119,25244.8%12 of 12
201283,96131.4%12 of 12
2013118,392Not reported12 of 12
2014115,28143.3%12 of 12
2015129,79548.7%12 of 12
2016134,78350.5%12 of 12
2017128,541Not reported12 of 12
2018153,39557.6%12 of 12
2019154,992Not reported12 of 12
2020152,100Not reported12 of 12
2021135,95459.9%12 of 12
2022148,25165.3%12 of 12
2023139,28461.4%12 of 12
2024141,85462.4%12 of 12
2025119,70752.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2010

Not reported

US short tons. 2009: Not reported

SO₂, 2010

Not reported

US short tons

NOx, 2010

344

US short tons

0 of 4 EPA units reported CO₂ in 2010 (AOW#1, AOW#2, AOW#3, AOW#4), matched to EIA plant 54216 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN7Wood/Wood Waste Biomass25.9November 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bowater Newport Coosa Pines Op as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query U S Alliance Coosa Pines and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near U S Alliance Coosa Pines

Questions about U S Alliance Coosa Pines

How much power does U S Alliance Coosa Pines produce?

U S Alliance Coosa Pines reported 119,707 MWh (120 GWh) of net generation in 2025, a 52.8% capacity factor on 25.9 MW of nameplate capacity.

Where is U S Alliance Coosa Pines?

U S Alliance Coosa Pines is in Talladega County, Alabama, at 33.3281, −86.3568. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates U S Alliance Coosa Pines?

EIA-860M for August 2026 lists Bowater Newport Coosa Pines Op as the operator (EIA operator ID 2053). The operator is not always the owner.

When did U S Alliance Coosa Pines start operating?

Its first generator began operating in November 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page