OilOperatingDUK

High Point, Fairfield

Oil power plant in Guilford County, North Carolina. 1.8 MW of nameplate capacity across 1 generator, operated by North Carolina Mun Power Agny #1.

Also known as EIA plant 56059

Analyst: free account, 1 question a day.

Ward WTPHigh Point, POLOEastside WWTPHigh Point, Pump Station RdTrinity SolarWestside WWTPHigh Point, Fairfield5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
1.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2002First generator online
Operator
North Carolina Mun Power Agny #1EIA operator ID 13630
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Guilford County, NC35.9244, −79.9901
EIA plant ID
56059EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power High Point, Fairfield produces

Free · EIA-923

Net generation, 2025

−36 MWh

−36 MWh, final

Capacity factor, 2025

-0.2%

2024: -0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−54.0–−29.0

MWh a year. Low 2020, high 2024

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003463Not reported12 of 12
2004Not reportedNot reported0 of 12
2005177Not reported12 of 12
200669Not reported12 of 12
200719Not reported12 of 12
200814Not reported12 of 12
20096Not reported12 of 12
2010−8-0.1%12 of 12
2011−46-0.3%12 of 12
2012−37-0.2%12 of 12
2013−44-0.3%12 of 12
2014−48-0.3%12 of 12
2015−47-0.3%12 of 12
2016−46-0.3%12 of 12
2017−45-0.3%12 of 12
2018−43-0.3%12 of 12
2019−39-0.2%12 of 12
2020−54-0.3%12 of 12
2021−54-0.3%12 of 12
2022−48-0.3%12 of 12
2023−47-0.3%12 of 12
2024−29-0.2%12 of 12
2025−36-0.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids1.8June 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Carolina Mun Power Agny #1 as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query High Point, Fairfield and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near High Point, Fairfield

More plants operated by North Carolina Mun Power Agny #1

Questions about High Point, Fairfield

How much power does High Point, Fairfield produce?

High Point, Fairfield reported −36 MWh (−36 MWh) of net generation in 2025.

Where is High Point, Fairfield?

High Point, Fairfield is in Guilford County, North Carolina, at 35.9244, −79.9901. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates High Point, Fairfield?

EIA-860M for August 2026 lists North Carolina Mun Power Agny #1 as the operator (EIA operator ID 13630). The operator is not always the owner.

When did High Point, Fairfield start operating?

Its first generator began operating in June 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page