OilOperatingDUK

High Point, POLO

Oil power plant in Guilford County, North Carolina. 1.8 MW of nameplate capacity across 1 generator, operated by North Carolina Mun Power Agny #1.

Also known as EIA plant 57196

Analyst: free account, 1 question a day.

Ward WTPHigh Point, Pump Station RdEastside WWTPHigh Point, FairfieldTrinity SolarWestside WWTPHigh Point, POLO5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
1.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2007First generator online
Operator
North Carolina Mun Power Agny #1EIA operator ID 13630
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Guilford County, NC35.9700, −79.9600
EIA plant ID
57196EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power High Point, POLO produces

Free · EIA-923

Net generation, 2025

37 MWh

37 MWh, final

Capacity factor, 2025

0.2%

2024: 0.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−39.0–85.0

MWh a year. Low 2023, high 2019

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
200917Not reported12 of 12
2010120.1%12 of 12
2011780.5%12 of 12
2012240.2%12 of 12
2013370.2%12 of 12
2014−2-0.0%12 of 12
2015−34-0.2%12 of 12
2016−30-0.2%12 of 12
2017600.4%12 of 12
2018460.3%12 of 12
2019850.5%12 of 12
2020590.4%12 of 12
2021480.3%12 of 12
2022780.5%12 of 12
2023−39-0.2%12 of 12
2024600.4%12 of 12
2025370.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids1.8November 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Carolina Mun Power Agny #1 as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query High Point, POLO and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near High Point, POLO

More plants operated by North Carolina Mun Power Agny #1

Questions about High Point, POLO

How much power does High Point, POLO produce?

High Point, POLO reported 37 MWh (37 MWh) of net generation in 2025, a 0.2% capacity factor on 1.8 MW of nameplate capacity.

Where is High Point, POLO?

High Point, POLO is in Guilford County, North Carolina, at 35.9700, −79.9600. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates High Point, POLO?

EIA-860M for August 2026 lists North Carolina Mun Power Agny #1 as the operator (EIA operator ID 13630). The operator is not always the owner.

When did High Point, POLO start operating?

Its first generator began operating in November 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page