Natural gasOperatingTEPC

Cogeneration 1

Natural gas power plant in Pima County, Arizona. 9 MW of nameplate capacity across 1 generator, operated by University of Arizona.

Also known as EIA plant 56229

Analyst: free account, 1 question a day.

Cogeneration 2Pima Energy Storage SystemDemoss PetrieAmphitheater High School SolarDavis Monthan AFB (AZ) West AirfieldH Wilson Sundt Generating StationCogeneration 15 km
Open in the map
6 plants within 9.0 km, from EIA coordinates.

Key facts

Capacity
9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2002First generator online
Operator
University of ArizonaEIA operator ID 49913
Grid
TEPCBalancing authority TEPC
Price nodes
None linkedNo verified ISO node
Location
Pima County, AZ32.2299, −110.9528
EIA plant ID
56229EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cogeneration 1 produces

Free · EIA-923

Net generation, 2025

48.3 GWh

48,269 MWh, final

Capacity factor, 2025

61.2%

2024: 68.9%

January to July 2026

31.2 GWh

Provisional

Range, 2015 to 2025

48.3–56.4

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
200451,028Not reported12 of 12
200553,993Not reported12 of 12
200654,289Not reported12 of 12
200754,083Not reported12 of 12
200854,030Not reported12 of 12
200955,460Not reported12 of 12
201056,30871.4%12 of 12
201149,59062.9%12 of 12
201257,95973.3%12 of 12
201357,54573.0%12 of 12
201447,69060.5%12 of 12
201551,17064.9%12 of 12
201654,33868.7%12 of 12
201755,28370.1%12 of 12
201856,08971.1%12 of 12
201955,89070.9%12 of 12
202056,41371.4%12 of 12
202150,73170.3%11 of 12
202253,65068.0%12 of 12
202354,14868.7%12 of 12
202454,47268.9%12 of 12
202548,26961.2%12 of 12
2026 (provisional, partial year)31,15768.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combined Cycle9.0November 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists University of Arizona as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cogeneration 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cogeneration 1

More plants operated by University of Arizona

Questions about Cogeneration 1

How much power does Cogeneration 1 produce?

Cogeneration 1 reported 48,269 MWh (48.3 GWh) of net generation in 2025, a 61.2% capacity factor on 9 MW of nameplate capacity. From January to July 2026 it reported 31.2 GWh, which is provisional.

Where is Cogeneration 1?

Cogeneration 1 is in Pima County, Arizona, at 32.2299, −110.9528. It is in the Tucson Electric Power Company balancing area (TEPC).

Who operates Cogeneration 1?

EIA-860M for August 2026 lists University of Arizona as the operator (EIA operator ID 49913). The operator is not always the owner.

When did Cogeneration 1 start operating?

Its first generator began operating in November 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page