Natural gasOperatingNYISO

Caithness Long Island Energy Center

Natural gas power plant in Suffolk County, New York. 348.9 MW of nameplate capacity across 2 generators, operated by Caithness Long Island, LLC.

Also known as EIA plant 56234

Analyst: free account, 1 question a day.

Brookhaven Landfill Solar Farm 1Orbit Bloom Fuel CellSWM Fuel CellPatchogue ESS2 km
Open in the map
6 plants within 7.3 km, from EIA coordinates.

Key facts

Capacity
348.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2009First generator online
Operator
Caithness Long Island, LLCEIA operator ID 49950
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Suffolk County, NY40.8142, −72.9403
EIA plant ID
56234EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Caithness Long Island produces

Free · EIA-923

Net generation, 2025

2.39 TWh

2,387,956 MWh, final

Capacity factor, 2025

78.1%

2024: 60.5%

January to July 2026

1.33 TWh

Provisional

Range, 2015 to 2025

1.9–2.5

TWh a year. Low 2024, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009793,220Not reported6 of 12
20102,106,29468.9%12 of 12
20112,247,41773.5%12 of 12
20122,250,53573.4%12 of 12
20132,379,615Not reported12 of 12
20142,397,68878.4%12 of 12
20152,017,827Not reported12 of 12
20162,531,72782.6%12 of 12
20172,415,15879.0%12 of 12
20182,477,22981.1%12 of 12
20192,186,10571.5%12 of 12
20202,171,33870.8%12 of 12
20212,480,76681.2%12 of 12
20222,322,87076.0%12 of 12
20232,464,32980.6%12 of 12
20241,853,12160.5%12 of 12
20252,387,95678.1%12 of 12
2026 (provisional, partial year)1,333,76375.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

954,833

US short tons. 2024: 744,993

SO₂, 2025

5

US short tons

NOx, 2025

55

US short tons

CO₂ per MWh, calculated

0.40 t

About 800 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 56234 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Municipal

Other. Dry cooling

Watershed stress

Very low/none · 0.110

USGS SUI, HUC12 Swan River-Great South Bay

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT01Natural Gas Fired Combined Cycle196.2August 2009
ST01Natural Gas Fired Combined Cycle152.7August 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Caithness Long Island, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Caithness Long Island Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Caithness Long Island

Questions about Caithness Long Island

How much power does Caithness Long Island Energy Center produce?

Caithness Long Island Energy Center reported 2,387,956 MWh (2.39 TWh) of net generation in 2025, a 78.1% capacity factor on 348.9 MW of nameplate capacity. From January to July 2026 it reported 1.33 TWh, which is provisional.

Where is Caithness Long Island Energy Center?

Caithness Long Island Energy Center is in Suffolk County, New York, at 40.8142, −72.9403. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Caithness Long Island Energy Center?

EIA-860M for August 2026 lists Caithness Long Island, LLC as the operator (EIA operator ID 49950). The operator is not always the owner.

When did Caithness Long Island Energy Center start operating?

Its first generator began operating in August 2009, according to EIA-860M.

Does InfraMap have power prices for Caithness Long Island Energy Center?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to Caithness Long Island Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page