WindOperatingNYISO

Maple Ridge Wind Farm

Wind power plant in Lewis County, New York. 321.2 MW of nameplate capacity across 4 generators, operated by Flat Rock Windpower, LLC.

Also known as Maple Ridge · Maple Ridge (Lowville) · Maple Ridge I · EIA plant 56290

Analyst: free account, 1 question a day.

Number Three Wind ProjectChambers 3 - Lewis Co…Roaring Brook, LLCMartinsburg CSG LLCGSPP 9605 E Rd N, LLCGSPP 9557 E Rd S, LLCMaple Ridge Wind Farm5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
321.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
December 2005First generator online
Operator
Flat Rock Windpower, LLCEIA operator ID 54684
Grid
NYISOBalancing authority NYIS
Price nodes
2 NYISO nodesResource nodes with prices
Location
Lewis County, NY43.7853, −75.5753
EIA plant ID
56290EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Maple Ridge Wind Farm produces

Free · EIA-923

Net generation, 2025

698 GWh

698,101 MWh, final

Capacity factor, 2025

24.8%

2024: 22.6%

January to July 2026

369 GWh

Provisional

Range, 2015 to 2025

550.8–786.7

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
20052,550Not reported12 of 12
2006543,936Not reported12 of 12
2007707,797Not reported12 of 12
2008751,386Not reported12 of 12
2009718,696Not reported12 of 12
2010701,51924.9%12 of 12
2011750,17426.6%12 of 12
2012723,94025.6%12 of 12
2013751,39326.6%12 of 12
2014813,13528.8%12 of 12
2015783,21927.8%12 of 12
2016764,32227.0%12 of 12
2017786,73227.9%12 of 12
2018739,63126.2%12 of 12
2019736,95526.1%12 of 12
2020741,223Not reported12 of 12
2021618,26822.0%12 of 12
2022681,84324.2%12 of 12
2023550,82319.6%12 of 12
2024636,55422.6%12 of 12
2025698,10124.8%12 of 12
2026 (provisional, partial year)369,32322.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine137.0December 2005
1AOnshore Wind Turbine61.1January 2006
2Onshore Wind Turbine33.0June 2006
3Onshore Wind Turbine90.1December 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Flat Rock Windpower, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Maple Ridge Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Maple Ridge Wind Farm

Questions about Maple Ridge Wind Farm

How much power does Maple Ridge Wind Farm produce?

Maple Ridge Wind Farm reported 698,101 MWh (698 GWh) of net generation in 2025, a 24.8% capacity factor on 321.2 MW of nameplate capacity. From January to July 2026 it reported 369 GWh, which is provisional.

Where is Maple Ridge Wind Farm?

Maple Ridge Wind Farm is in Lewis County, New York, at 43.7853, −75.5753. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Maple Ridge Wind Farm?

EIA-860M for August 2026 lists Flat Rock Windpower, LLC as the operator (EIA operator ID 54684). The operator is not always the owner.

When did Maple Ridge Wind Farm start operating?

Its first generator began operating in December 2005, according to EIA-860M.

Does InfraMap have power prices for Maple Ridge Wind Farm?

Yes. InfraMap has NYISO day-ahead and real-time prices at 2 price nodes linked to Maple Ridge Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page