WindOperatingISO-NE

Lempster Wind LLC

Wind power plant in Sullivan County, New Hampshire. 24 MW of nameplate capacity across 1 generator, operated by Avangrid Power LLC.

Also known as Lempster Wind · Lempster · EIA plant 56399

Analyst: free account, 1 question a day.

JackmanAntrim WindLower Village Water Power ProjectNE Renewable Springfield, LLCBellows FallsLempster Wind10 km
Open in the map
6 plants within 27 km, from EIA coordinates.

Key facts

Capacity
24 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2008First generator online
Operator
Avangrid Power LLCEIA operator ID 15399
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Sullivan County, NH43.2330, −72.1455
EIA plant ID
56399EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lempster Wind produces

Free · EIA-923

Net generation, 2025

67.7 GWh

67,652 MWh, final

Capacity factor, 2025

32.2%

2024: 29.1%

January to July 2026

37.6 GWh

Provisional

Range, 2015 to 2025

55.6–69.0

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
200810,319Not reported12 of 12
200962,477Not reported12 of 12
201075,68836.0%12 of 12
201166,09231.4%12 of 12
201263,66230.2%12 of 12
201369,58333.1%12 of 12
201466,64231.7%12 of 12
201568,11432.4%12 of 12
201668,96532.7%12 of 12
201764,33830.6%12 of 12
201861,63829.3%12 of 12
201966,51931.6%12 of 12
202067,67832.1%12 of 12
202161,79929.4%12 of 12
202262,75029.8%12 of 12
202355,62326.5%12 of 12
202461,40629.1%12 of 12
202567,65232.2%12 of 12
2026 (provisional, partial year)37,55930.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine24.0December 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lempster Wind LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lempster Wind

More plants operated by Avangrid Power LLC

Questions about Lempster Wind

How much power does Lempster Wind LLC produce?

Lempster Wind LLC reported 67,652 MWh (67.7 GWh) of net generation in 2025, a 32.2% capacity factor on 24 MW of nameplate capacity. From January to July 2026 it reported 37.6 GWh, which is provisional.

Where is Lempster Wind LLC?

Lempster Wind LLC is in Sullivan County, New Hampshire, at 43.2330, −72.1455. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Lempster Wind LLC?

EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.

When did Lempster Wind LLC start operating?

Its first generator began operating in December 2008, according to EIA-860M.

Does InfraMap have power prices for Lempster Wind LLC?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Lempster Wind LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page