Natural gasBattery storageOperatingCAISO

Grapeland Hybrid

Natural gas project in San Bernardino County, California. 59.8 MW of nameplate capacity across 2 generators, operated by Southern California Edison Co.

Also known as Grapeland Hybrid Power Plant · EIA plant 56472

This project groups Grapeland Hybrid (EIA 56472). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Foundation IESunE RochesterEtiwandaRancho Cucamonga Dist #1Grapeland Hybrid1 km
Open in the map
5 plants within 2.0 km, from EIA coordinates.

Key facts

Capacity
59.8 MWNatural gas 49.8 · Battery storage 10.0
Generators
2 operatingEIA-860M, August 2026
Operating since
September 2007First generator online
Operator
Southern California Edison CoEIA operator ID 17609
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Bernardino County, CA34.0903, −117.5343
EIA plant ID
56472EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Grapeland Hybrid produces

Free · EIA-923

Net generation, 2025

2.19 GWh

2,190 MWh, final

Capacity factor, 2025

0.5%

2024: 0.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.2–22.9

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
20076,890Not reported12 of 12
20083,681Not reported12 of 12
20091,287Not reported12 of 12
20104,4101.0%12 of 12
20112,6160.6%12 of 12
201221,3504.9%12 of 12
201321,2074.9%12 of 12
201414,0443.2%12 of 12
201521,6365.0%12 of 12
20162,783Not reported1 of 12
201722,9005.2%12 of 12
20189,8922.3%12 of 12
20196,9931.6%12 of 12
202017,5314.0%12 of 12
202122,5045.2%12 of 12
202210,2182.3%12 of 12
20233,9980.9%12 of 12
20243,8620.9%12 of 12
20252,1900.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2,467

US short tons. 2024: 4,359

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

1.13 t

About 2,253 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (CT1), matched to EIA plant 56472 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine49.8September 2007
BA1Batteries10.0December 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern California Edison Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Grapeland Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Grapeland Hybrid

More plants operated by Southern California Edison Co

Questions about Grapeland Hybrid

How much power does Grapeland Hybrid produce?

Grapeland Hybrid reported 2,190 MWh (2.19 GWh) of net generation in 2025, a 0.5% capacity factor on 59.8 MW of nameplate capacity.

Where is Grapeland Hybrid?

Grapeland Hybrid is in San Bernardino County, California, at 34.0903, −117.5343. It is in the California Independent System Operator balancing area (CISO).

Who operates Grapeland Hybrid?

EIA-860M for August 2026 lists Southern California Edison Co as the operator (EIA operator ID 17609). The operator is not always the owner.

When did Grapeland Hybrid start operating?

Its first generator began operating in September 2007, according to EIA-860M.

Does InfraMap have power prices for Grapeland Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Grapeland Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page