WindOperatingPJM

NedPower Mount Storm

Wind power plant in Grant County, West Virginia. 264 MW of nameplate capacity across 2 generators, operated by Clearway Energy Operating LLC.

Also known as Mount Storm Wind Farm · NedPower Mount Storm, Phase II · NedPower Mount Storm, Phase I · EIA plant 56495

Analyst: free account, 1 question a day.

Mt StormNew Creek WindBlack Rock WindRoth Rock North Wind Farm, LLCCriterionFair Wind10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
264 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
March 2008First generator online
Operator
Clearway Energy Operating LLCEIA operator ID 64536
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Grant County, WV39.2175, −79.2094
EIA plant ID
56495EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NedPower Mount Storm produces

Free · EIA-923

Net generation, 2025

332 GWh

331,623 MWh, final

Capacity factor, 2025

14.3%

2024: 22.6%

January to July 2026

11.7 GWh

Provisional

Range, 2015 to 2025

331.6–653.0

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008222,471Not reported10 of 12
2009579,436Not reported12 of 12
2010702,97930.4%12 of 12
2011654,18728.3%12 of 12
2012587,12025.3%12 of 12
2013600,27726.0%12 of 12
2014604,75026.1%12 of 12
2015618,49326.7%12 of 12
2016633,02427.3%12 of 12
2017566,61124.5%12 of 12
2018611,33026.4%12 of 12
2019579,69025.1%12 of 12
2020652,96128.2%12 of 12
2021566,80224.5%12 of 12
2022594,01025.7%12 of 12
2023573,18724.8%12 of 12
2024524,92022.6%12 of 12
2025331,62314.3%12 of 12
2026 (provisional, partial year)11,6890.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MS1Onshore Wind Turbine164.0March 2008
MS2Onshore Wind Turbine100.0December 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Clearway Energy Operating LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NedPower Mount Storm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NedPower Mount Storm

More plants operated by Clearway Energy Operating LLC

Questions about NedPower Mount Storm

How much power does NedPower Mount Storm produce?

NedPower Mount Storm reported 331,623 MWh (332 GWh) of net generation in 2025, a 14.3% capacity factor on 264 MW of nameplate capacity. From January to July 2026 it reported 11.7 GWh, which is provisional.

Where is NedPower Mount Storm?

NedPower Mount Storm is in Grant County, West Virginia, at 39.2175, −79.2094. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates NedPower Mount Storm?

EIA-860M for August 2026 lists Clearway Energy Operating LLC as the operator (EIA operator ID 64536). The operator is not always the owner.

When did NedPower Mount Storm start operating?

Its first generator began operating in March 2008, according to EIA-860M.

Does InfraMap have power prices for NedPower Mount Storm?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to NedPower Mount Storm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page