Key facts

Capacity
249.8 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
September 2012First generator online
Operator
Clearway Energy Operating LLCEIA operator ID 64536
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
San Luis Obispo County, CA35.3237, −119.9166
EIA plant ID
57439EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power California Valley Solar Ranch produces

Free · EIA-923

Net generation, 2025

559 GWh

558,684 MWh, final

Capacity factor, 2025

25.5%

2024: 27.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

476.4–690.6

GWh a year. Low 2022, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201221,727Not reported4 of 12
2013399,364Not reported12 of 12
2014684,40331.3%12 of 12
2015688,25331.5%12 of 12
2016679,79631.0%12 of 12
2017647,54129.6%12 of 12
2018676,63330.9%12 of 12
2019584,79526.7%12 of 12
2020643,55929.3%12 of 12
2021690,64631.6%12 of 12
2022476,35821.8%12 of 12
2023623,76328.5%12 of 12
2024597,67627.2%12 of 12
2025558,68425.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HPR2Solar Photovoltaic32.3October 2013
HPR2ASolar Photovoltaic21.0September 2012
HPR2BSolar Photovoltaic86.5January 2013
HPR2CSolar Photovoltaic70.0October 2013
HPR2DSolar Photovoltaic40.0January 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Clearway Energy Operating LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query California Valley Solar Ranch and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near California Valley Solar Ranch

More plants operated by Clearway Energy Operating LLC

Questions about California Valley Solar Ranch

How much power does California Valley Solar Ranch produce?

California Valley Solar Ranch reported 558,684 MWh (559 GWh) of net generation in 2025, a 25.5% capacity factor on 249.8 MW of nameplate capacity.

Where is California Valley Solar Ranch?

California Valley Solar Ranch is in San Luis Obispo County, California, at 35.3237, −119.9166. It is in the California Independent System Operator balancing area (CISO).

Who operates California Valley Solar Ranch?

EIA-860M for August 2026 lists Clearway Energy Operating LLC as the operator (EIA operator ID 64536). The operator is not always the owner.

When did California Valley Solar Ranch start operating?

Its first generator began operating in September 2012, according to EIA-860M.

Does InfraMap have power prices for California Valley Solar Ranch?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to California Valley Solar Ranch, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05