Natural gasSolarOperatingNEVP

Western 102 Power Plant

Natural gas power plant in Storey County, Nevada. 118.6 MW of nameplate capacity across 15 generators, operated by Nevada Gold Mines.

Also known as Western 102 Generating Station · EIA plant 56500

Analyst: free account, 1 question a day.

TracyTurquoise Nevada, LLCTurquoise Liberty SolarTesla Reno GigaFactoryWestern 1022 km
Open in the map
5 plants within 6.6 km, from EIA coordinates.

Key facts

Capacity
118.6 MWNatural gas 117.6 · Solar 1.0
Generators
15 operatingEIA-860M, August 2026
Operating since
December 2005First generator online
Operator
Nevada Gold MinesEIA operator ID 55710
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Storey County, NV39.5603, −119.5108
EIA plant ID
56500EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Western 102 produces

Free · EIA-923

Net generation, 2025

406 GWh

406,176 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

217 GWh

Provisional

Range, 2015 to 2025

280.4–490.7

GWh a year. Low 2016, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006345,365Not reported12 of 12
2007412,459Not reported12 of 12
2008338,507Not reported12 of 12
2009204,781Not reported12 of 12
2010200,87919.3%12 of 12
2011168,98916.3%12 of 12
2012264,36925.4%12 of 12
2013250,56024.1%12 of 12
2014240,96423.2%12 of 12
2015304,75029.3%12 of 12
2016280,39726.9%12 of 12
2017293,78928.3%12 of 12
2018332,23332.0%12 of 12
2019312,23630.1%12 of 12
2020327,11631.4%12 of 12
2021337,28832.5%12 of 12
2022353,32334.0%12 of 12
2023490,659Not reported12 of 12
2024472,074Not reported12 of 12
2025406,176Not reported12 of 12
2026 (provisional, partial year)217,24336.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
A101Natural Gas Internal Combustion Engine8.4December 2005
B102Natural Gas Internal Combustion Engine8.4December 2005
B202Natural Gas Internal Combustion Engine8.4December 2005
C102Natural Gas Internal Combustion Engine8.4December 2005
C202Natural Gas Internal Combustion Engine8.4December 2005
D101Natural Gas Internal Combustion Engine8.4December 2005
E102Natural Gas Internal Combustion Engine8.4December 2005
E202Natural Gas Internal Combustion Engine8.4December 2005
F102Natural Gas Internal Combustion Engine8.4December 2005
F202Natural Gas Internal Combustion Engine8.4December 2005
G102Natural Gas Internal Combustion Engine8.4December 2005
G202Natural Gas Internal Combustion Engine8.4December 2005
H102Natural Gas Internal Combustion Engine8.4December 2005
H202Natural Gas Internal Combustion Engine8.4December 2005
PV1Solar Photovoltaic1.0December 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nevada Gold Mines as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Western 102 Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Western 102

Questions about Western 102

How much power does Western 102 Power Plant produce?

Western 102 Power Plant reported 406,176 MWh (406 GWh) of net generation in 2025. From January to July 2026 it reported 217 GWh, which is provisional.

Where is Western 102 Power Plant?

Western 102 Power Plant is in Storey County, Nevada, at 39.5603, −119.5108. It is in the Nevada Power Company balancing area (NEVP).

Who operates Western 102 Power Plant?

EIA-860M for August 2026 lists Nevada Gold Mines as the operator (EIA operator ID 55710). The operator is not always the owner.

When did Western 102 Power Plant start operating?

Its first generator began operating in December 2005, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page