WindOperatingPJM

North Allegheny Windpower Project

Wind power plant in Blair County, Pennsylvania. 75 MW of nameplate capacity across 1 generator, operated by Deriva Energy.

Also known as North Allegheny Repower · EIA plant 56651

Analyst: free account, 1 question a day.

Allegheny Ridge Wind FarmChestnut Flats Wind FarmCPV Maple Hill SolarEbensburg PowerHighland North Wind FarmNorth Allegheny Windp…10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
75 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2009First generator online
Operator
Deriva EnergyEIA operator ID 65411
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Blair County, PA40.4381, −78.5436
EIA plant ID
56651EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power North Allegheny Windpower Project produces

Free · EIA-923

Net generation, 2025

218 GWh

217,942 MWh, final

Capacity factor, 2025

33.2%

2024: 19.0%

January to July 2026

132 GWh

Provisional

Range, 2015 to 2025

72.8–217.9

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
200947,828Not reported4 of 12
2010177,75529.0%12 of 12
2011160,61026.2%12 of 12
2012143,87423.4%12 of 12
2013140,68522.9%12 of 12
2014160,00926.1%12 of 12
2015136,36122.2%12 of 12
2016145,64323.7%12 of 12
2017150,75924.6%12 of 12
2018152,45424.9%12 of 12
2019148,86424.3%12 of 12
2020158,93225.8%12 of 12
2021142,98323.3%12 of 12
2022128,34520.9%12 of 12
202372,841Not reported12 of 12
2024125,04219.0%12 of 12
2025217,94233.2%12 of 12
2026 (provisional, partial year)131,56934.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine75.0September 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Deriva Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query North Allegheny Windpower Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near North Allegheny Windpower Project

More plants operated by Deriva Energy

Questions about North Allegheny Windpower Project

How much power does North Allegheny Windpower Project produce?

North Allegheny Windpower Project reported 217,942 MWh (218 GWh) of net generation in 2025, a 33.2% capacity factor on 75 MW of nameplate capacity. From January to July 2026 it reported 132 GWh, which is provisional.

Where is North Allegheny Windpower Project?

North Allegheny Windpower Project is in Blair County, Pennsylvania, at 40.4381, −78.5436. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates North Allegheny Windpower Project?

EIA-860M for August 2026 lists Deriva Energy as the operator (EIA operator ID 65411). The operator is not always the owner.

When did North Allegheny Windpower Project start operating?

Its first generator began operating in September 2009, according to EIA-860M.

Does InfraMap have power prices for North Allegheny Windpower Project?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to North Allegheny Windpower Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page