North Allegheny Windpower Project
Wind power plant in Blair County, Pennsylvania. 75 MW of nameplate capacity across 1 generator, operated by Deriva Energy.
Also known as North Allegheny Repower · EIA plant 56651
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 75 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- September 2009First generator online
- Operator
- Deriva EnergyEIA operator ID 65411
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Blair County, PA40.4381, −78.5436
- EIA plant ID
- 56651EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power North Allegheny Windpower Project produces
Free · EIA-923Net generation, 2025
218 GWh
217,942 MWh, final
Capacity factor, 2025
33.2%
2024: 19.0%
January to July 2026
132 GWh
Provisional
Range, 2015 to 2025
72.8–217.9
GWh a year. Low 2023, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 47,828 | Not reported | 4 of 12 |
| 2010 | 177,755 | 29.0% | 12 of 12 |
| 2011 | 160,610 | 26.2% | 12 of 12 |
| 2012 | 143,874 | 23.4% | 12 of 12 |
| 2013 | 140,685 | 22.9% | 12 of 12 |
| 2014 | 160,009 | 26.1% | 12 of 12 |
| 2015 | 136,361 | 22.2% | 12 of 12 |
| 2016 | 145,643 | 23.7% | 12 of 12 |
| 2017 | 150,759 | 24.6% | 12 of 12 |
| 2018 | 152,454 | 24.9% | 12 of 12 |
| 2019 | 148,864 | 24.3% | 12 of 12 |
| 2020 | 158,932 | 25.8% | 12 of 12 |
| 2021 | 142,983 | 23.3% | 12 of 12 |
| 2022 | 128,345 | 20.9% | 12 of 12 |
| 2023 | 72,841 | Not reported | 12 of 12 |
| 2024 | 125,042 | 19.0% | 12 of 12 |
| 2025 | 217,942 | 33.2% | 12 of 12 |
| 2026 (provisional, partial year) | 131,569 | 34.5% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 75.0 | September 2009 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Deriva Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query North Allegheny Windpower Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near North Allegheny Windpower Project
More plants operated by Deriva Energy
Questions about North Allegheny Windpower Project
How much power does North Allegheny Windpower Project produce?
North Allegheny Windpower Project reported 217,942 MWh (218 GWh) of net generation in 2025, a 33.2% capacity factor on 75 MW of nameplate capacity. From January to July 2026 it reported 132 GWh, which is provisional.
Where is North Allegheny Windpower Project?
North Allegheny Windpower Project is in Blair County, Pennsylvania, at 40.4381, −78.5436. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates North Allegheny Windpower Project?
EIA-860M for August 2026 lists Deriva Energy as the operator (EIA operator ID 65411). The operator is not always the owner.
When did North Allegheny Windpower Project start operating?
Its first generator began operating in September 2009, according to EIA-860M.
Does InfraMap have power prices for North Allegheny Windpower Project?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to North Allegheny Windpower Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page