SolarOperatingCAISO

Bolthouse S&P and Rowen Farms Solar

Solar power plant in Los Angeles County, California. 1.2 MW of nameplate capacity across 4 generators, operated by MMA WBF Power LP.

Also known as EIA plant 56862

Analyst: free account, 1 question a day.

Watts 3115SCE-Snowline-Duncan Road (North)RE Victor Phelan Solar One LLCBolthouse S&P and Row…10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
1.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
November 2008First generator online
Operator
MMA WBF Power LPEIA operator ID 56105
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA34.5644, −117.6933
EIA plant ID
56862EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bolthouse S&P and Rowen Farms Solar produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–3.8

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008219Not reported12 of 12
20092,526Not reported12 of 12
20102,58724.6%12 of 12
20114,29940.9%12 of 12
20124,23140.1%12 of 12
20134,05338.6%12 of 12
20144,08938.9%12 of 12
20152,25921.5%12 of 12
20163,77835.8%12 of 12
20173,27031.1%12 of 12
20181,88617.9%12 of 12
20193,32531.6%12 of 12
20202,77926.4%12 of 12
20211,54814.7%12 of 12
20228578.2%12 of 12
2023930.9%12 of 12
2024670.6%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic0.3November 2008
2Solar Photovoltaic0.3November 2008
3Solar Photovoltaic0.3November 2008
4Solar Photovoltaic0.3November 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MMA WBF Power LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bolthouse S&P and Rowen Farms Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bolthouse S&P and Rowen Farms Solar

Questions about Bolthouse S&P and Rowen Farms Solar

How much power does Bolthouse S&P and Rowen Farms Solar produce?

Bolthouse S&P and Rowen Farms Solar reported 0 MWh (0 MWh) of net generation in 2025.

Where is Bolthouse S&P and Rowen Farms Solar?

Bolthouse S&P and Rowen Farms Solar is in Los Angeles County, California, at 34.5644, −117.6933. It is in the California Independent System Operator balancing area (CISO).

Who operates Bolthouse S&P and Rowen Farms Solar?

EIA-860M for August 2026 lists MMA WBF Power LP as the operator (EIA operator ID 56105). The operator is not always the owner.

When did Bolthouse S&P and Rowen Farms Solar start operating?

Its first generator began operating in November 2008, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page