WindBattery storageOperatingERCOT

Inadale Wind Farm LLC Hybrid

Wind project in Nolan County, Texas. 206.9 MW of nameplate capacity across 2 generators, operated by RWE Clean Energy.

Also known as Inadale (Roscoe IV) · EIA plant 56984

This project groups Inadale Wind Farm LLC Hybrid (EIA 56984). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Roscoe Wind Farm LLCChampion Wind Farm LLCPyron Wind Farm LLC HybridSweetwater BESSLoraine Windpark Project LLCInadale Wind Farm LLC Hybrid10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
206.9 MWWind 197.0 · Battery storage 9.9
Generators
2 operatingEIA-860M, August 2026
Operating since
September 2009First generator online
Operator
RWE Clean EnergyEIA operator ID 67192
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Nolan County, TX32.4969, −100.5797
EIA plant ID
56984EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Inadale Wind Farm LLC Hybrid produces

Free · EIA-923

Net generation, 2025

321 GWh

321,174 MWh, final

Capacity factor, 2025

18.7%

2024: 19.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

321.2–539.2

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009156,718Not reported5 of 12
2010384,48122.3%12 of 12
2011380,44322.0%12 of 12
2012476,47227.5%12 of 12
2013549,30031.8%12 of 12
2014592,68734.3%12 of 12
2015495,00528.7%12 of 12
2016539,17731.2%12 of 12
2017506,87929.4%12 of 12
2018526,945Not reported12 of 12
2019536,09231.1%12 of 12
2020502,36429.1%12 of 12
2021460,98626.8%12 of 12
2022437,45625.4%12 of 12
2023427,18724.8%12 of 12
2024335,06319.4%12 of 12
2025321,17418.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine197.0September 2009
INABTBatteries9.9January 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RWE Clean Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Inadale Wind Farm LLC Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Inadale Wind Farm LLC Hybrid

More plants operated by RWE Clean Energy

Questions about Inadale Wind Farm LLC Hybrid

How much power does Inadale Wind Farm LLC Hybrid produce?

Inadale Wind Farm LLC Hybrid reported 321,174 MWh (321 GWh) of net generation in 2025, a 18.7% capacity factor on 206.9 MW of nameplate capacity.

Where is Inadale Wind Farm LLC Hybrid?

Inadale Wind Farm LLC Hybrid is in Nolan County, Texas, at 32.4969, −100.5797. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Inadale Wind Farm LLC Hybrid?

EIA-860M for August 2026 lists RWE Clean Energy as the operator (EIA operator ID 67192). The operator is not always the owner.

When did Inadale Wind Farm LLC Hybrid start operating?

Its first generator began operating in September 2009, according to EIA-860M.

Does InfraMap have power prices for Inadale Wind Farm LLC Hybrid?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Inadale Wind Farm LLC Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page