HydroOperating

Lake Dorothy Hydroelectric Project

Hydro power plant in Juneau, Alaska. 14.3 MW of nameplate capacity across 1 generator, operated by Alaska Electric Light & Power Co..

Also known as EIA plant 57085

Analyst: free account, 1 question a day.

Annex CreekSnettishamGold CreekSalmon Creek 1Industrial PlantLake Dorothy Hydroele…20 km
Open in the map
5 plants within 36 km, from EIA coordinates.

Key facts

Capacity
14.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2009First generator online
Operator
Alaska Electric Light & Power Co.EIA operator ID 213
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Juneau, AK58.2325, −134.0533
EIA plant ID
57085EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lake Dorothy Hydroelectric Project produces

Free · EIA-923

Net generation, 2025

81.7 GWh

81,670 MWh, final

Capacity factor, 2025

65.2%

2024: 66.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

67.9–88.6

GWh a year. Low 2019, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
200936,296Not reported12 of 12
201058,74146.9%12 of 12
201170,60256.4%12 of 12
201284,46767.2%12 of 12
201382,51965.9%12 of 12
201483,60066.7%12 of 12
201584,92167.8%12 of 12
201687,45469.6%12 of 12
201777,15061.6%12 of 12
201881,55865.1%12 of 12
201967,93254.2%12 of 12
202072,44457.7%12 of 12
202187,44669.8%12 of 12
202284,04367.1%12 of 12
202388,60270.7%12 of 12
202483,62566.6%12 of 12
202581,67065.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric14.3September 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alaska Electric Light & Power Co. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lake Dorothy Hydroelectric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lake Dorothy Hydroelectric Project

More plants operated by Alaska Electric Light & Power Co.

Questions about Lake Dorothy Hydroelectric Project

How much power does Lake Dorothy Hydroelectric Project produce?

Lake Dorothy Hydroelectric Project reported 81,670 MWh (81.7 GWh) of net generation in 2025, a 65.2% capacity factor on 14.3 MW of nameplate capacity.

Where is Lake Dorothy Hydroelectric Project?

Lake Dorothy Hydroelectric Project is in Juneau, Alaska, at 58.2325, −134.0533.

Who operates Lake Dorothy Hydroelectric Project?

EIA-860M for August 2026 lists Alaska Electric Light & Power Co. as the operator (EIA operator ID 213). The operator is not always the owner.

When did Lake Dorothy Hydroelectric Project start operating?

Its first generator began operating in September 2009, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page