Rugby Wind Power Project
Wind power plant in Pierce County, North Dakota. 149 MW of nameplate capacity across 1 generator, operated by Avangrid Power LLC.
Also known as Rugby · EIA plant 57097
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 149 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2009First generator online
- Operator
- Avangrid Power LLCEIA operator ID 15399
- Grid
- MISOBalancing authority MISO
- Price nodes
- 4 MISO nodesResource nodes with prices
- Location
- Pierce County, ND48.4968, −99.9513
- EIA plant ID
- 57097EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Rugby Wind Power Project produces
Free · EIA-923Net generation, 2025
348 GWh
348,061 MWh, final
Capacity factor, 2025
26.7%
2024: 25.6%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
333.2–429.4
GWh a year. Low 2023, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 0 | Not reported | 12 of 12 |
| 2010 | 324,143 | 27.1% | 11 of 12 |
| 2011 | 395,699 | 30.3% | 12 of 12 |
| 2012 | 405,292 | 31.0% | 12 of 12 |
| 2013 | 383,785 | 29.4% | 12 of 12 |
| 2014 | 434,190 | 33.3% | 12 of 12 |
| 2015 | 366,681 | 28.1% | 12 of 12 |
| 2016 | 404,510 | 30.9% | 12 of 12 |
| 2017 | 428,598 | 32.8% | 12 of 12 |
| 2018 | 406,700 | 31.2% | 12 of 12 |
| 2019 | 393,213 | 30.1% | 12 of 12 |
| 2020 | 363,123 | 27.7% | 12 of 12 |
| 2021 | 411,326 | 31.5% | 12 of 12 |
| 2022 | 429,440 | 32.9% | 12 of 12 |
| 2023 | 333,213 | 25.5% | 12 of 12 |
| 2024 | 335,401 | 25.6% | 12 of 12 |
| 2025 | 348,061 | 26.7% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 149.0 | December 2009 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Rugby Wind Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Rugby Wind Power Project
More plants operated by Avangrid Power LLC
Questions about Rugby Wind Power Project
How much power does Rugby Wind Power Project produce?
Rugby Wind Power Project reported 348,061 MWh (348 GWh) of net generation in 2025, a 26.7% capacity factor on 149 MW of nameplate capacity.
Where is Rugby Wind Power Project?
Rugby Wind Power Project is in Pierce County, North Dakota, at 48.4968, −99.9513. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Rugby Wind Power Project?
EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.
When did Rugby Wind Power Project start operating?
Its first generator began operating in December 2009, according to EIA-860M.
Does InfraMap have power prices for Rugby Wind Power Project?
Yes. InfraMap has MISO day-ahead and real-time prices at 4 price nodes linked to Rugby Wind Power Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05