SolarOperatingCAISO

Agua Caliente Solar Project

Solar power plant in Yuma County, Arizona. 347.7 MW of nameplate capacity across 3 generators, operated by Agua Caliente Solar.

Also known as EIA plant 57373

Analyst: free account, 1 question a day.

White Wing SolarSierra Pinta BESSMcFarland B Solar and StorageMcFarland A Solar and StorageMcFarland CAgua Caliente Solar Project2 km
Open in the map
5 plants within 3.5 km, from EIA coordinates.

Key facts

Capacity
347.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2012First generator online
Operator
Agua Caliente SolarEIA operator ID 59396
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Yuma County, AZ32.9774, −113.4945
EIA plant ID
57373EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Agua Caliente Solar Project produces

Free · EIA-923

Net generation, 2025

547 GWh

546,916 MWh, final

Capacity factor, 2025

18.0%

2024: 21.5%

January to July 2026

252 GWh

Provisional

Range, 2015 to 2025

546.9–743.5

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012379,595Not reported9 of 12
2013675,52534.0%12 of 12
2014741,181Not reported12 of 12
2015739,73424.3%12 of 12
2016743,53324.3%12 of 12
2017728,74023.9%12 of 12
2018723,32423.7%12 of 12
2019716,16723.5%12 of 12
2020724,68123.7%12 of 12
2021706,96123.2%12 of 12
2022726,68023.9%12 of 12
2023691,33422.7%12 of 12
2024656,05121.5%12 of 12
2025546,91618.0%12 of 12
2026 (provisional, partial year)251,87714.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
AGU1Solar Photovoltaic90.7May 2012
AGU2Solar Photovoltaic136.0December 2012
AGU3Solar Photovoltaic121.0February 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Agua Caliente Solar as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Agua Caliente Solar Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Agua Caliente Solar Project

Questions about Agua Caliente Solar Project

How much power does Agua Caliente Solar Project produce?

Agua Caliente Solar Project reported 546,916 MWh (547 GWh) of net generation in 2025, a 18.0% capacity factor on 347.7 MW of nameplate capacity. From January to July 2026 it reported 252 GWh, which is provisional.

Where is Agua Caliente Solar Project?

Agua Caliente Solar Project is in Yuma County, Arizona, at 32.9774, −113.4945. It is in the California Independent System Operator balancing area (CISO).

Who operates Agua Caliente Solar Project?

EIA-860M for August 2026 lists Agua Caliente Solar as the operator (EIA operator ID 59396). The operator is not always the owner.

When did Agua Caliente Solar Project start operating?

Its first generator began operating in May 2012, according to EIA-860M.

Does InfraMap have power prices for Agua Caliente Solar Project?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Agua Caliente Solar Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page