Natural gasOperatingCAISO

Caltech Central

Natural gas power plant in Los Angeles County, California. 1.1 MW of nameplate capacity across 11 generators, operated by Bloom Energy 2009 PPA.

Also known as EIA plant 57460

Analyst: free account, 1 question a day.

GlenarmRatkovich AlhambraCaltech Central2 km
Open in the map
6 plants within 7.4 km, from EIA coordinates.

Key facts

Capacity
1.1 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
November 2010First generator online
Operator
Bloom Energy 2009 PPAEIA operator ID 56778
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA34.1358, −118.1267
EIA plant ID
57460EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Caltech Central produces

Free · EIA-923

Net generation, 2025

7.73 GWh

7,729 MWh, final

Capacity factor, 2025

80.2%

2024: 89.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–8.7

GWh a year. Low 2016, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
20101,607Not reported12 of 12
20117,58586.6%12 of 12
20125,79265.9%12 of 12
20134,70948.9%12 of 12
20147,033Not reported12 of 12
20157,02172.9%12 of 12
201680.1%12 of 12
20178,47387.9%12 of 12
20188,30486.2%12 of 12
20197,72280.1%12 of 12
20207,370Not reported12 of 12
20217,16674.4%12 of 12
20226,74970.0%12 of 12
20234014.2%12 of 12
20248,66889.7%12 of 12
20257,72980.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CL00Other Natural Gas0.1November 2010
CL01Other Natural Gas0.1November 2010
CL02Other Natural Gas0.1November 2010
CL03Other Natural Gas0.1November 2010
CL04Other Natural Gas0.1November 2010
CL05Other Natural Gas0.1November 2010
CL06Other Natural Gas0.1November 2010
CL07Other Natural Gas0.1November 2010
CL08Other Natural Gas0.1November 2010
CL09Other Natural Gas0.1November 2010
CL10Other Natural Gas0.1November 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bloom Energy 2009 PPA as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Caltech Central and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Caltech Central

More plants operated by Bloom Energy 2009 PPA

Questions about Caltech Central

How much power does Caltech Central produce?

Caltech Central reported 7,729 MWh (7.73 GWh) of net generation in 2025, a 80.2% capacity factor on 1.1 MW of nameplate capacity.

Where is Caltech Central?

Caltech Central is in Los Angeles County, California, at 34.1358, −118.1267. It is in the California Independent System Operator balancing area (CISO).

Who operates Caltech Central?

EIA-860M for August 2026 lists Bloom Energy 2009 PPA as the operator (EIA operator ID 56778). The operator is not always the owner.

When did Caltech Central start operating?

Its first generator began operating in November 2010, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page