SolarOperatingCAISO

Westside Solar Station

Solar power plant in Fresno County, California. 15 MW of nameplate capacity across 1 generator, operated by Pacific Gas & Electric Co..

Also known as EIA plant 57499

Analyst: free account, 1 question a day.

Whitney Point SolarFive Points Solar StationOpen Sky DairyOpen Sky Ranch IncWestside Solar Station5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
15 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2011First generator online
Operator
Pacific Gas & Electric Co.EIA operator ID 14328
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Fresno County, CA36.3787, −120.1249
EIA plant ID
57499EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Westside Solar Station produces

Free · EIA-923

Net generation, 2025

12.0 GWh

12,046 MWh, final

Capacity factor, 2025

9.2%

2024: 10.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

12.0–30.6

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20118,343Not reported12 of 12
201232,30124.5%12 of 12
201332,64224.8%12 of 12
201432,10224.4%12 of 12
201528,71321.9%12 of 12
201630,61223.2%12 of 12
201725,38319.3%12 of 12
201828,70821.8%12 of 12
201927,66321.1%12 of 12
202024,38918.5%12 of 12
202120,84015.9%12 of 12
202217,69913.5%12 of 12
202318,52914.1%12 of 12
202413,87010.5%12 of 12
202512,0469.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic15.0August 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pacific Gas & Electric Co. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Westside Solar Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Westside Solar Station

More plants operated by Pacific Gas & Electric Co.

Questions about Westside Solar Station

How much power does Westside Solar Station produce?

Westside Solar Station reported 12,046 MWh (12.0 GWh) of net generation in 2025, a 9.2% capacity factor on 15 MW of nameplate capacity.

Where is Westside Solar Station?

Westside Solar Station is in Fresno County, California, at 36.3787, −120.1249. It is in the California Independent System Operator balancing area (CISO).

Who operates Westside Solar Station?

EIA-860M for August 2026 lists Pacific Gas & Electric Co. as the operator (EIA operator ID 14328). The operator is not always the owner.

When did Westside Solar Station start operating?

Its first generator began operating in August 2011, according to EIA-860M.

Does InfraMap have power prices for Westside Solar Station?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Westside Solar Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page