OilOperatingISO-NE

Lebanon Pines 1 & 2

Oil power plant in New London County, Connecticut. 5.2 MW of nameplate capacity across 2 generators, operated by Connecticut Mun Elec Engy Coop.

Also known as EIA plant 57604

Analyst: free account, 1 question a day.

Generate Colchester Fuel Cells, LLCLNG 1 & 2CMEEC - Rogers Rd SolarLebanon Pines 1 & 25 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
5.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
April 2010First generator online
Operator
Connecticut Mun Elec Engy CoopEIA operator ID 4180
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
New London County, CT41.5683, −72.2322
EIA plant ID
57604EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lebanon Pines 1 & 2 produces

Free · EIA-923

Net generation, 2025

374 MWh

374 MWh, final

Capacity factor, 2025

0.8%

2024: 1.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

374.0–822.0

MWh a year. Low 2025, high 2015

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20114381.0%12 of 12
20124321.0%12 of 12
20136501.5%12 of 12
20148572.0%12 of 12
2015822Not reported12 of 12
20167071.5%12 of 12
20175361.2%12 of 12
20185041.1%12 of 12
20195101.1%12 of 12
20207491.6%12 of 12
20214931.1%12 of 12
20224601.0%12 of 12
20235771.3%12 of 12
20244711.0%12 of 12
20253740.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
LP1Petroleum Liquids2.6April 2010
LP2Petroleum Liquids2.6April 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Connecticut Mun Elec Engy Coop as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lebanon Pines 1 & 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lebanon Pines 1 & 2

More plants operated by Connecticut Mun Elec Engy Coop

Questions about Lebanon Pines 1 & 2

How much power does Lebanon Pines 1 & 2 produce?

Lebanon Pines 1 & 2 reported 374 MWh (374 MWh) of net generation in 2025, a 0.8% capacity factor on 5.2 MW of nameplate capacity.

Where is Lebanon Pines 1 & 2?

Lebanon Pines 1 & 2 is in New London County, Connecticut, at 41.5683, −72.2322. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Lebanon Pines 1 & 2?

EIA-860M for August 2026 lists Connecticut Mun Elec Engy Coop as the operator (EIA operator ID 4180). The operator is not always the owner.

When did Lebanon Pines 1 & 2 start operating?

Its first generator began operating in April 2010, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page