Topaz Solar Farm

Solar power plant in San Luis Obispo County, California. 585.9 MW of nameplate capacity across 5 generators, operated by Topaz Solar Farms LLC.

Also known as EIA plant 57695

Analyst: free account, 1 question a day.

California Valley Solar RanchWonderful Orchards - West ValleyBlackwell Solar ParkWonderful Orchards - BelridgeLost Hills/BlackwellTopaz Solar Farm20 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
585.9 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
April 2013First generator online
Operator
Topaz Solar Farms LLCEIA operator ID 59874
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Luis Obispo County, CA35.4056, −120.0686
EIA plant ID
57695EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Topaz Solar Farm produces

Free · EIA-923

Net generation, 2025

1.02 TWh

1,018,564 MWh, final

Capacity factor, 2025

19.8%

2024: 20.8%

January to July 2026

524 GWh

Provisional

Range, 2015 to 2025

1.0–1.3

TWh a year. Low 2025, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013401,308Not reported11 of 12
20141,105,857Not reported12 of 12
20151,301,33725.4%12 of 12
20161,265,76024.6%12 of 12
20171,237,53224.1%12 of 12
20181,335,72726.0%12 of 12
20191,255,72224.5%12 of 12
20201,282,71624.9%12 of 12
20211,300,78825.3%12 of 12
20221,221,41023.8%12 of 12
20231,036,77420.2%12 of 12
20241,071,07620.8%12 of 12
20251,018,56419.8%12 of 12
2026 (provisional, partial year)523,71517.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TPZ1Solar Photovoltaic129.8April 2013
TPZ2Solar Photovoltaic151.2June 2013
TPZ3Solar Photovoltaic102.1January 2014
TPZ4Solar Photovoltaic90.3November 2014
TPZ5Solar Photovoltaic112.5October 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Topaz Solar Farms LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Topaz Solar Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Topaz Solar Farm

Questions about Topaz Solar Farm

How much power does Topaz Solar Farm produce?

Topaz Solar Farm reported 1,018,564 MWh (1.02 TWh) of net generation in 2025, a 19.8% capacity factor on 585.9 MW of nameplate capacity. From January to July 2026 it reported 524 GWh, which is provisional.

Where is Topaz Solar Farm?

Topaz Solar Farm is in San Luis Obispo County, California, at 35.4056, −120.0686. It is in the California Independent System Operator balancing area (CISO).

Who operates Topaz Solar Farm?

EIA-860M for August 2026 lists Topaz Solar Farms LLC as the operator (EIA operator ID 59874). The operator is not always the owner.

When did Topaz Solar Farm start operating?

Its first generator began operating in April 2013, according to EIA-860M.

Does InfraMap have power prices for Topaz Solar Farm?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Topaz Solar Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page