HydroOperatingBPAT

Youngs Creek Hydroelectric Project

Hydro power plant in Snohomish County, Washington. 7.5 MW of nameplate capacity across 1 generator, operated by PUD No 1 of Snohomish County - (WA).

Also known as Youngs Creek Hydro Project · EIA plant 57763

Analyst: free account, 1 question a day.

South Fork ToltH M JacksonCalligan Creek Hydroelectric ProjectHancock Creek Hydroelectric ProjectSnoqualmie 2Youngs Creek Hydroele…10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
7.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2011First generator online
Operator
PUD No 1 of Snohomish County - (WA)EIA operator ID 17470
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Snohomish County, WA47.7916, −121.8000
EIA plant ID
57763EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Youngs Creek Hydroelectric Project produces

Free · EIA-923

Net generation, 2025

12.9 GWh

12,850 MWh, final

Capacity factor, 2025

19.6%

2024: 28.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

4.9–20.8

GWh a year. Low 2018, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20113,058Not reported12 of 12
201221,27532.3%12 of 12
201318,67128.4%12 of 12
201421,55032.8%12 of 12
201512,64119.2%12 of 12
201618,55228.2%12 of 12
201716,36024.9%12 of 12
20184,8777.4%12 of 12
201912,29218.7%12 of 12
202020,82031.6%12 of 12
202117,84227.2%12 of 12
202214,57722.2%12 of 12
202314,86222.6%12 of 12
202418,65028.3%12 of 12
202512,85019.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric7.5November 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PUD No 1 of Snohomish County - (WA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Youngs Creek Hydroelectric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Youngs Creek Hydroelectric Project

More plants operated by PUD No 1 of Snohomish County - (WA)

Questions about Youngs Creek Hydroelectric Project

How much power does Youngs Creek Hydroelectric Project produce?

Youngs Creek Hydroelectric Project reported 12,850 MWh (12.9 GWh) of net generation in 2025, a 19.6% capacity factor on 7.5 MW of nameplate capacity.

Where is Youngs Creek Hydroelectric Project?

Youngs Creek Hydroelectric Project is in Snohomish County, Washington, at 47.7916, −121.8000. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Youngs Creek Hydroelectric Project?

EIA-860M for August 2026 lists PUD No 1 of Snohomish County - (WA) as the operator (EIA operator ID 17470). The operator is not always the owner.

When did Youngs Creek Hydroelectric Project start operating?

Its first generator began operating in November 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page