East Campus Utility Plant
Oil power plant in Hamilton County, Ohio. 6 MW of nameplate capacity across 3 generators, operated by University of Cincinnati.
Also known as EIA plant 57929
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 6 MWNameplate
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- July 2006First generator online
- Operator
- University of CincinnatiEIA operator ID 57281
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Hamilton County, OH39.1379, −84.5049
- EIA plant ID
- 57929EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power East Campus Utility Plant produces
Free · EIA-923Net generation, 2025
500 MWh
500 MWh, final
Capacity factor, 2025
1.0%
2024: Not reported
January to July 2026
389 MWh
Provisional
Range, 2015 to 2025
51.9–499.8
MWh a year. Low 2020, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 1,094 | 2.6% | 12 of 12 |
| 2012 | 105 | Not reported | 12 of 12 |
| 2013 | 155 | 0.4% | 12 of 12 |
| 2014 | 74 | Not reported | 12 of 12 |
| 2015 | 102 | 0.2% | 12 of 12 |
| 2016 | 137 | 0.3% | 12 of 12 |
| 2017 | 147 | 0.3% | 12 of 12 |
| 2018 | 255 | 0.6% | 12 of 12 |
| 2019 | 152 | 0.4% | 12 of 12 |
| 2020 | 52 | 0.1% | 12 of 12 |
| 2021 | 123 | 0.3% | 12 of 12 |
| 2022 | 198 | Not reported | 12 of 12 |
| 2023 | 249 | 0.4% | 12 of 12 |
| 2024 | Not reported | Not reported | 0 of 12 |
| 2025 | 500 | 1.0% | 12 of 12 |
| 2026 (provisional, partial year) | 389 | 1.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| P007 | Petroleum Liquids | 2.0 | July 2006 |
| P008 | Petroleum Liquids | 1.5 | July 2006 |
| P058 | Petroleum Liquids | 2.5 | May 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists University of Cincinnati as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query East Campus Utility Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near East Campus Utility Plant
More plants operated by University of Cincinnati
Questions about East Campus Utility Plant
How much power does East Campus Utility Plant produce?
East Campus Utility Plant reported 500 MWh (500 MWh) of net generation in 2025, a 1.0% capacity factor on 6 MW of nameplate capacity. From January to July 2026 it reported 389 MWh, which is provisional.
Where is East Campus Utility Plant?
East Campus Utility Plant is in Hamilton County, Ohio, at 39.1379, −84.5050. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates East Campus Utility Plant?
EIA-860M for August 2026 lists University of Cincinnati as the operator (EIA operator ID 57281). The operator is not always the owner.
When did East Campus Utility Plant start operating?
Its first generator began operating in July 2006, according to EIA-860M.
Does InfraMap have power prices for East Campus Utility Plant?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to East Campus Utility Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page