Natural gasOilOperatingPJM

Central Utility Plant Cincinnati

Natural gas power plant in Hamilton County, Ohio. 47.2 MW of nameplate capacity across 4 generators, operated by University of Cincinnati.

Also known as EIA plant 57908

Analyst: free account, 1 question a day.

RA Jones Roof Mounted Solar SystemL'Oreal Solar - FlorenceCentral Utility Plant…10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
47.2 MWNatural gas 45.3 · Oil 1.9
Generators
4 operatingEIA-860M, August 2026
Operating since
June 2004First generator online
Operator
University of CincinnatiEIA operator ID 57281
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Hamilton County, OH39.1345, −84.5094
EIA plant ID
57908EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Central Utility Plant Cincinnati produces

Free · EIA-923

Net generation, 2025

215 GWh

214,508 MWh, final

Capacity factor, 2025

51.9%

2024: 57.0%

January to July 2026

133 GWh

Provisional

Range, 2015 to 2025

85.2–236.5

GWh a year. Low 2015, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011171,04041.4%12 of 12
2012226,68954.7%12 of 12
2013138,959Not reported12 of 12
201461,18414.8%12 of 12
201585,15020.6%12 of 12
2016172,18641.5%12 of 12
2017203,33549.2%12 of 12
2018196,11647.4%12 of 12
2019199,24448.2%12 of 12
2020194,19346.8%12 of 12
2021218,83152.9%12 of 12
2022206,34849.9%12 of 12
2023225,95954.6%12 of 12
2024236,50857.0%12 of 12
2025214,50851.9%12 of 12
2026 (provisional, partial year)133,21455.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle11.9June 2004
CTG2Natural Gas Fired Combined Cycle11.9June 2004
P005Petroleum Liquids1.9June 2004
STGNatural Gas Fired Combined Cycle21.5June 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists University of Cincinnati as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Central Utility Plant Cincinnati and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Central Utility Plant Cincinnati

More plants operated by University of Cincinnati

Questions about Central Utility Plant Cincinnati

How much power does Central Utility Plant Cincinnati produce?

Central Utility Plant Cincinnati reported 214,508 MWh (215 GWh) of net generation in 2025, a 51.9% capacity factor on 47.2 MW of nameplate capacity. From January to July 2026 it reported 133 GWh, which is provisional.

Where is Central Utility Plant Cincinnati?

Central Utility Plant Cincinnati is in Hamilton County, Ohio, at 39.1345, −84.5094. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Central Utility Plant Cincinnati?

EIA-860M for August 2026 lists University of Cincinnati as the operator (EIA operator ID 57281). The operator is not always the owner.

When did Central Utility Plant Cincinnati start operating?

Its first generator began operating in June 2004, according to EIA-860M.

Does InfraMap have power prices for Central Utility Plant Cincinnati?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Central Utility Plant Cincinnati, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page