Walter C Beckjord
Battery storage project in Clermont County, Ohio. 4 MW of nameplate capacity across 2 generators, operated by Duke Energy Ohio Inc.
Also known as EIA plant 2830
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 4 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- January 2015First generator online
- Operator
- Duke Energy Ohio IncEIA operator ID 3542
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Clermont County, OH38.9917, −84.2981
- EIA plant ID
- 2830EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Walter C Beckjord produces
Free · EIA-923Net generation, 2025
−414 MWh
−414 MWh, final
Battery discharge, 2025
1.09 GWh
Charge 1.50 GWh
January to July 2026
−69 MWh
Provisional
Range, 2015 to 2025
−54.0–0.0
GWh a year. Low 2016, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 7,350,754 | Not reported | 12 of 12 |
| 2001 | 6,029,354 | Not reported | 12 of 12 |
| 2002 | 6,756,632 | Not reported | 12 of 12 |
| 2003 | 5,953,967 | Not reported | 11 of 12 |
| 2004 | 6,073,757 | Not reported | 12 of 12 |
| 2005 | 6,523,513 | Not reported | 12 of 12 |
| 2006 | 6,149,996 | Not reported | 12 of 12 |
| 2007 | 6,122,999 | Not reported | 12 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 5,085,615 | Not reported | 12 of 12 |
| 2010 | 3,772,205 | 30.1% | 12 of 12 |
| 2011 | 3,651,873 | 29.1% | 12 of 12 |
| 2012 | 3,242,604 | 28.1% | 12 of 12 |
| 2013 | 2,546,784 | 25.0% | 12 of 12 |
| 2014 | 1,549,141 | 23.3% | 12 of 12 |
| 2015 | 0 | Not reported | 12 of 12 |
| 2016 | −53,992 | Not reported | 12 of 12 |
| 2017 | −1,191 | Not reported | 12 of 12 |
| 2018 | −1,285 | Not reported | 12 of 12 |
| 2019 | −1,217 | Not reported | 12 of 12 |
| 2020 | −880 | Not reported | 12 of 12 |
| 2021 | −497 | Not reported | 12 of 12 |
| 2022 | −473 | Not reported | 12 of 12 |
| 2023 | −430 | Not reported | 12 of 12 |
| 2024 | −522 | Not reported | 12 of 12 |
| 2025 | −414 | Not reported | 12 of 12 |
| 2026 (provisional, partial year) | −69 | Not reported | 7 of 7 |
* 2026 covers January to July and is provisional. Battery plants can report negative net generation, when charging uses more energy than they discharge.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2009
Not reported
US short tons. 2008: Not reported
SO₂, 2009
41,965
US short tons
NOx, 2009
10,953
US short tons
6 of 10 EPA units reported CO₂ in 2009 (1, 2, 3, 4, 5, 6, CT1, CT2, and others), matched to EIA plant 2830 through the EPA–EIA crosswalk.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BECK1 | Batteries | 2.0 | January 2015 |
| BECK2 | Batteries | 2.0 | November 2015 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Ohio Inc as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Walter C Beckjord and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Walter C Beckjord
More plants operated by Duke Energy Ohio Inc
Questions about Walter C Beckjord
How much power does Walter C Beckjord produce?
Walter C Beckjord reported −414 MWh (−414 MWh) of net generation in 2025. From January to July 2026 it reported −69 MWh, which is provisional.
Where is Walter C Beckjord?
Walter C Beckjord is in Clermont County, Ohio, at 38.9917, −84.2981. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Walter C Beckjord?
EIA-860M for August 2026 lists Duke Energy Ohio Inc as the operator (EIA operator ID 3542). The operator is not always the owner.
When did Walter C Beckjord start operating?
Its first generator began operating in January 2015, according to EIA-860M.
Does InfraMap have power prices for Walter C Beckjord?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Walter C Beckjord, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page