Natural gasOperatingCAISO

Lodi Energy Center

Natural gas power plant in San Joaquin County, California. 288.9 MW of nameplate capacity across 2 generators, operated by Northern California Power Agny.

Also known as Lodi Energy Center Power Plant · EIA plant 57978

Analyst: free account, 1 question a day.

Sutter Home Winery WestsideEnchanted Rock LodiUniversity of the PacificStockton BiomassSMUD at FleshmanLodi10 km
Open in the map
6 plants within 17 km, from EIA coordinates.

Key facts

Capacity
288.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2012First generator online
Operator
Northern California Power AgnyEIA operator ID 40613
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Joaquin County, CA38.0881, −121.3875
EIA plant ID
57978EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lodi produces

Free · EIA-923

Net generation, 2025

580 GWh

580,109 MWh, final

Capacity factor, 2025

22.9%

2024: 30.6%

January to July 2026

145 GWh

Provisional

Range, 2015 to 2025

0.5–1.7

TWh a year. Low 2016, high 2021

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012162,443Not reported2 of 12
20131,191,114Not reported12 of 12
2014844,25049.7%8 of 12
20151,692,217Not reported12 of 12
2016530,18720.9%12 of 12
2017726,51128.7%12 of 12
20181,406,54055.6%12 of 12
20191,189,33147.0%12 of 12
2020706,09027.8%12 of 12
20211,725,36768.2%12 of 12
2022840,30633.2%12 of 12
20231,112,51044.0%12 of 12
2024776,16730.6%12 of 12
2025580,10922.9%12 of 12
2026 (provisional, partial year)145,3469.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

247,325

US short tons. 2024: 330,169

SO₂, 2025

1

US short tons

NOx, 2025

13

US short tons

CO₂ per MWh, calculated

0.43 t

About 853 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (CT1), matched to EIA plant 57978 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

39

million gallons

Consumption, 2024

20

million gallons

Source

Treatment Plant Effluent

Discharge, Reclaimed. Induced-draft tower

Watershed stress

High · 0.797

USGS SUI, HUC12 Town of Lodi

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combined Cycle185.0November 2012
ST1Natural Gas Fired Combined Cycle103.9November 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Northern California Power Agny as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lodi Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lodi

More plants operated by Northern California Power Agny

Questions about Lodi

How much power does Lodi Energy Center produce?

Lodi Energy Center reported 580,109 MWh (580 GWh) of net generation in 2025, a 22.9% capacity factor on 288.9 MW of nameplate capacity. From January to July 2026 it reported 145 GWh, which is provisional.

Where is Lodi Energy Center?

Lodi Energy Center is in San Joaquin County, California, at 38.0881, −121.3875. It is in the California Independent System Operator balancing area (CISO).

Who operates Lodi Energy Center?

EIA-860M for August 2026 lists Northern California Power Agny as the operator (EIA operator ID 40613). The operator is not always the owner.

When did Lodi Energy Center start operating?

Its first generator began operating in November 2012, according to EIA-860M.

Does InfraMap have power prices for Lodi Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Lodi Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page