Natural gasOperatingPJM

Summit Street Power Plant

Natural gas power plant in Portage County, Ohio. 13.2 MW of nameplate capacity across 2 generators, operated by Kent State University.

Also known as EIA plant 58140

Analyst: free account, 1 question a day.

Akron WRFIGS AKC1Cuyahoga Generating FacilityWadsworth IPS RTO BTMSummit Street10 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
13.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 2003First generator online
Operator
Kent State UniversityEIA operator ID 58097
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Portage County, OH41.1431, −81.3408
EIA plant ID
58140EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Summit Street produces

Free · EIA-923

Net generation, 2025

29.3 GWh

29,261 MWh, final

Capacity factor, 2025

25.3%

2024: 30.6%

January to July 2026

16.0 GWh

Provisional

Range, 2015 to 2025

10.5–44.0

GWh a year. Low 2019, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201253,21545.9%12 of 12
201340,74135.2%12 of 12
201433,43828.9%12 of 12
201531,85927.6%12 of 12
201641,09435.4%12 of 12
201743,94638.0%12 of 12
201844,03238.1%12 of 12
201910,4959.1%12 of 12
202010,5309.1%12 of 12
202114,80812.8%12 of 12
202223,81320.6%12 of 12
202330,95426.8%12 of 12
202435,52930.6%12 of 12
202529,26125.3%12 of 12
2026 (provisional, partial year)16,01123.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT-1Natural Gas Fired Combustion Turbine5.7January 2003
GT-2Natural Gas Fired Combustion Turbine7.5April 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Kent State University as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Summit Street Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Summit Street

Questions about Summit Street

How much power does Summit Street Power Plant produce?

Summit Street Power Plant reported 29,261 MWh (29.3 GWh) of net generation in 2025, a 25.3% capacity factor on 13.2 MW of nameplate capacity. From January to July 2026 it reported 16.0 GWh, which is provisional.

Where is Summit Street Power Plant?

Summit Street Power Plant is in Portage County, Ohio, at 41.1431, −81.3408. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Summit Street Power Plant?

EIA-860M for August 2026 lists Kent State University as the operator (EIA operator ID 58097). The operator is not always the owner.

When did Summit Street Power Plant start operating?

Its first generator began operating in January 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page