Summit Street Power Plant
Natural gas power plant in Portage County, Ohio. 13.2 MW of nameplate capacity across 2 generators, operated by Kent State University.
Also known as EIA plant 58140
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 13.2 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- January 2003First generator online
- Operator
- Kent State UniversityEIA operator ID 58097
- Grid
- PJMBalancing authority PJM
- Price nodes
- None linkedNo verified ISO node
- Location
- Portage County, OH41.1431, −81.3408
- EIA plant ID
- 58140EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Summit Street produces
Free · EIA-923Net generation, 2025
29.3 GWh
29,261 MWh, final
Capacity factor, 2025
25.3%
2024: 30.6%
January to July 2026
16.0 GWh
Provisional
Range, 2015 to 2025
10.5–44.0
GWh a year. Low 2019, high 2018
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | 53,215 | 45.9% | 12 of 12 |
| 2013 | 40,741 | 35.2% | 12 of 12 |
| 2014 | 33,438 | 28.9% | 12 of 12 |
| 2015 | 31,859 | 27.6% | 12 of 12 |
| 2016 | 41,094 | 35.4% | 12 of 12 |
| 2017 | 43,946 | 38.0% | 12 of 12 |
| 2018 | 44,032 | 38.1% | 12 of 12 |
| 2019 | 10,495 | 9.1% | 12 of 12 |
| 2020 | 10,530 | 9.1% | 12 of 12 |
| 2021 | 14,808 | 12.8% | 12 of 12 |
| 2022 | 23,813 | 20.6% | 12 of 12 |
| 2023 | 30,954 | 26.8% | 12 of 12 |
| 2024 | 35,529 | 30.6% | 12 of 12 |
| 2025 | 29,261 | 25.3% | 12 of 12 |
| 2026 (provisional, partial year) | 16,011 | 23.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GT-1 | Natural Gas Fired Combustion Turbine | 5.7 | January 2003 |
| GT-2 | Natural Gas Fired Combustion Turbine | 7.5 | April 2004 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Kent State University as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Summit Street Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Summit Street
Questions about Summit Street
How much power does Summit Street Power Plant produce?
Summit Street Power Plant reported 29,261 MWh (29.3 GWh) of net generation in 2025, a 25.3% capacity factor on 13.2 MW of nameplate capacity. From January to July 2026 it reported 16.0 GWh, which is provisional.
Where is Summit Street Power Plant?
Summit Street Power Plant is in Portage County, Ohio, at 41.1431, −81.3408. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Summit Street Power Plant?
EIA-860M for August 2026 lists Kent State University as the operator (EIA operator ID 58097). The operator is not always the owner.
When did Summit Street Power Plant start operating?
Its first generator began operating in January 2003, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page