SolarOperatingAZPS

Union HS at Casa Grande

Solar power plant in Pinal County, Arizona. 1.6 MW of nameplate capacity across 1 generator, operated by Luminace Solar Holding, LLC.

Also known as EIA plant 58516

Analyst: free account, 1 question a day.

Vista Grande HS at Casa GrandeDesert BasinSundanceEleven Mile Solar CenterEast Line SolarUnion HS at Casa Grande10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
1.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2012First generator online
Operator
Luminace Solar Holding, LLCEIA operator ID 58491
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Pinal County, AZ32.9369, −111.7386
EIA plant ID
58516EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Union HS at Casa Grande produces

Free · EIA-923

Net generation, 2025

2.63 GWh

2,625 MWh, final

Capacity factor, 2025

18.7%

2024: 20.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.6–3.4

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
20133,36424.0%12 of 12
20143,34323.9%12 of 12
20153,19622.8%12 of 12
20163,40424.2%12 of 12
20173,27423.4%12 of 12
20183,21923.0%12 of 12
20192,85220.3%12 of 12
20203,27423.3%12 of 12
20213,13622.4%12 of 12
20222,88620.6%12 of 12
20232,57318.4%12 of 12
20242,85920.3%12 of 12
20252,62518.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PV1Solar Photovoltaic1.6December 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Luminace Solar Holding, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Union HS at Casa Grande and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Union HS at Casa Grande

More plants operated by Luminace Solar Holding, LLC

Questions about Union HS at Casa Grande

How much power does Union HS at Casa Grande produce?

Union HS at Casa Grande reported 2,625 MWh (2.63 GWh) of net generation in 2025, a 18.7% capacity factor on 1.6 MW of nameplate capacity.

Where is Union HS at Casa Grande?

Union HS at Casa Grande is in Pinal County, Arizona, at 32.9369, −111.7386. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Union HS at Casa Grande?

EIA-860M for August 2026 lists Luminace Solar Holding, LLC as the operator (EIA operator ID 58491). The operator is not always the owner.

When did Union HS at Casa Grande start operating?

Its first generator began operating in December 2012, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page