Key facts

Capacity
745.1 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
October 2001First generator online
Operator
Salt River ProjectEIA operator ID 16572
Grid
SRPBalancing authority SRP
Price nodes
None linkedNo verified ISO node
Location
Pinal County, AZ32.9042, −111.7889
EIA plant ID
55129EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Desert Basin produces

Free · EIA-923

Net generation, 2025

2.08 TWh

2,084,973 MWh, final

Capacity factor, 2025

31.9%

2024: 41.9%

January to July 2026

1.35 TWh

Provisional

Range, 2015 to 2025

1.0–3.0

TWh a year. Low 2017, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001773,119Not reported3 of 12
20023,543,743Not reported12 of 12
20032,938,605Not reported12 of 12
20042,462,092Not reported12 of 12
20052,446,371Not reported12 of 12
20061,340,878Not reported12 of 12
20071,643,070Not reported12 of 12
20081,546,498Not reported12 of 12
20091,092,922Not reported12 of 12
20101,163,96720.6%12 of 12
2011679,64612.0%12 of 12
20121,123,30919.8%12 of 12
2013889,387Not reported12 of 12
20141,464,69425.9%12 of 12
20151,953,79334.5%12 of 12
20161,154,72820.3%12 of 12
20171,032,87818.2%12 of 12
20182,335,54341.3%12 of 12
20192,220,07939.2%12 of 12
20201,801,698Not reported12 of 12
20211,865,594Not reported12 of 12
2022251,333Not reported4 of 12
20232,994,69845.9%12 of 12
20242,741,39141.9%12 of 12
20252,084,97331.9%12 of 12
2026 (provisional, partial year)1,350,72435.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

953,268

US short tons. 2024: 1.25M

SO₂, 2025

5

US short tons

NOx, 2025

86

US short tons

CO₂ per MWh, calculated

0.46 t

About 914 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (DBG1, DBG2, DBG4, DBG5), matched to EIA plant 55129 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

844

million gallons

Consumption, 2024

844

million gallons

Source

Central Arizona Project Canal

Surface, Fresh. Induced-draft tower

Watershed stress

High · 0.746

USGS SUI, HUC12 North Branch Santa Cruz Wash

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle187.0October 2001
CTG2Natural Gas Fired Combined Cycle187.0October 2001
CTG4Natural Gas Fired Combustion Turbine49.5September 2022
CTG5Natural Gas Fired Combustion Turbine49.5September 2022
STGNatural Gas Fired Combined Cycle272.1October 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Salt River Project as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Desert Basin and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Desert Basin

More plants operated by Salt River Project

Questions about Desert Basin

How much power does Desert Basin produce?

Desert Basin reported 2,084,973 MWh (2.08 TWh) of net generation in 2025, a 31.9% capacity factor on 745.1 MW of nameplate capacity. From January to July 2026 it reported 1.35 TWh, which is provisional.

Where is Desert Basin?

Desert Basin is in Pinal County, Arizona, at 32.9042, −111.7889. It is in the Salt River Project balancing area (SRP).

Who operates Desert Basin?

EIA-860M for August 2026 lists Salt River Project as the operator (EIA operator ID 16572). The operator is not always the owner.

When did Desert Basin start operating?

Its first generator began operating in October 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page