Key facts

Capacity
1,023 MWNameplate
Generators
18 operatingEIA-860M, August 2026
Operating since
May 2011First generator online
Operator
Salt River ProjectEIA operator ID 16572
Grid
SRPBalancing authority SRP
Price nodes
None linkedNo verified ISO node
Location
Pinal County, AZ32.9174, −111.5033
EIA plant ID
56948EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Coolidge Generation Station produces

Free · EIA-923

Net generation, 2025

58.8 GWh

58,818 MWh, final

Capacity factor, 2025

0.9%

2024: 3.1%

January to July 2026

65.2 GWh

Provisional

Range, 2015 to 2025

58.8–499.6

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011113,961Not reported8 of 12
2012314,2314.9%12 of 12
2013234,2123.7%12 of 12
2014211,1143.3%12 of 12
2015277,2904.4%12 of 12
2016167,6962.6%12 of 12
2017167,2652.6%12 of 12
2018155,3342.4%12 of 12
2019330,1925.2%12 of 12
2020499,5667.8%12 of 12
2021276,7614.4%12 of 12
2022329,9465.2%12 of 12
2023422,1136.6%12 of 12
2024197,3363.1%12 of 12
202558,8180.9%12 of 12
2026 (provisional, partial year)65,152Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

40,668

US short tons. 2024: 123,377

SO₂, 2025

0

US short tons

NOx, 2025

7

US short tons

CO₂ per MWh, calculated

0.69 t

About 1,383 lb per MWh

12 of 12 EPA units reported CO₂ in 2025 (CT01, CT02, CT03, CT04, CT05, CT06, CT07, CT08, and others), matched to EIA plant 56948 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine60.5May 2011
2Natural Gas Fired Combustion Turbine60.5May 2011
3Natural Gas Fired Combustion Turbine60.5May 2011
4Natural Gas Fired Combustion Turbine60.5May 2011
5Natural Gas Fired Combustion Turbine60.5May 2011
6Natural Gas Fired Combustion Turbine60.5May 2011
7Natural Gas Fired Combustion Turbine60.5May 2011
8Natural Gas Fired Combustion Turbine60.5May 2011
9Natural Gas Fired Combustion Turbine60.5May 2011
10Natural Gas Fired Combustion Turbine60.5May 2011
11Natural Gas Fired Combustion Turbine60.5May 2011
12Natural Gas Fired Combustion Turbine60.5May 2011
COE13Natural Gas Fired Combustion Turbine49.5June 2026
COE14Natural Gas Fired Combustion Turbine49.5June 2026
COE15Natural Gas Fired Combustion Turbine49.5June 2026
COE16Natural Gas Fired Combustion Turbine49.5June 2026
COE17Natural Gas Fired Combustion Turbine49.5June 2026
COE18Natural Gas Fired Combustion Turbine49.5June 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Salt River Project as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Coolidge Generation Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Coolidge Generation Station

More plants operated by Salt River Project

Questions about Coolidge Generation Station

How much power does Coolidge Generation Station produce?

Coolidge Generation Station reported 58,818 MWh (58.8 GWh) of net generation in 2025, a 0.9% capacity factor on 1,023 MW of nameplate capacity. From January to July 2026 it reported 65.2 GWh, which is provisional.

Where is Coolidge Generation Station?

Coolidge Generation Station is in Pinal County, Arizona, at 32.9174, −111.5033. It is in the Salt River Project balancing area (SRP).

Who operates Coolidge Generation Station?

EIA-860M for August 2026 lists Salt River Project as the operator (EIA operator ID 16572). The operator is not always the owner.

When did Coolidge Generation Station start operating?

Its first generator began operating in May 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page