SolarWindOperatingTEPC

Red Horse 2

Solar and wind power plant in Cochise County, Arizona. 81 MW of nameplate capacity across 2 generators, operated by Red Horse 2.

Also known as EIA plant 58833

Analyst: free account, 1 question a day.

Red Horse IIIRoadrunner Solar and BESSApache Solar IRed Horse 220 km
Open in the map
5 plants within 31 km, from EIA coordinates.

Key facts

Capacity
81 MWSolar 51.0 · Wind 30.0
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2015First generator online
Operator
Red Horse 2EIA operator ID 59146
Grid
TEPCBalancing authority TEPC
Price nodes
None linkedNo verified ISO node
Location
Cochise County, AZ32.2861, −110.0881
EIA plant ID
58833EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Red Horse 2 produces

Free · EIA-923

Net generation, 2025

144 GWh

144,209 MWh, final

Capacity factor, 2025

20.3%

2024: 27.4%

January to July 2026

121 GWh

Provisional

Range, 2016 to 2025

144.2–226.2

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
201577,030Not reported5 of 12
2016220,10830.9%12 of 12
2017214,23630.2%12 of 12
2018226,10631.9%12 of 12
2019213,10330.0%12 of 12
2020226,23231.8%12 of 12
2021212,93530.0%12 of 12
2022214,14930.2%12 of 12
2023203,38228.7%12 of 12
2024194,85927.4%12 of 12
2025144,20920.3%12 of 12
2026 (provisional, partial year)121,17629.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
RH2SSolar Photovoltaic51.0August 2015
RH2WOnshore Wind Turbine30.0August 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Red Horse 2 as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Red Horse 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Red Horse 2

Questions about Red Horse 2

How much power does Red Horse 2 produce?

Red Horse 2 reported 144,209 MWh (144 GWh) of net generation in 2025, a 20.3% capacity factor on 81 MW of nameplate capacity. From January to July 2026 it reported 121 GWh, which is provisional.

Where is Red Horse 2?

Red Horse 2 is in Cochise County, Arizona, at 32.2861, −110.0881. It is in the Tucson Electric Power Company balancing area (TEPC).

Who operates Red Horse 2?

EIA-860M for August 2026 lists Red Horse 2 as the operator (EIA operator ID 59146). The operator is not always the owner.

Is Red Horse 2 a solar or a wind plant?

Both. Solar capacity totals 51 MW and wind capacity totals 30 MW.

When did Red Horse 2 start operating?

Its first generator began operating in August 2015, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page