Roadrunner Solar and BESS

Solar and battery storage project in Cochise County, Arizona. 470 MW of nameplate capacity across 2 generators, operated by Clenera LLC.

Also known as Apache Solar II · EIA plant 67823

This project groups Roadrunner Solar and BESS (EIA 67823). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Apache Solar IRed Horse IIIRed Horse 2Roadrunner Solar and…10 km
Open in the map
5 plants within 26 km, from EIA coordinates.

Key facts

Capacity
470 MWSolar 235.0 · Battery storage 235.0
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2025First generator online
Operator
Clenera LLCEIA operator ID 60232
Grid
WALCBalancing authority WALC
Price nodes
None linkedNo verified ISO node
Location
Cochise County, AZ32.0861, −109.9353
EIA plant ID
67823EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Roadrunner Solar and BESS produces

Free · EIA-923

Net generation, 2025

32.9 GWh

32,947 MWh, final. 1 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

316 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
202532,947Not reported1 of 12
2026 (provisional, partial year)315,874Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
RRBESBatteries235.0January 2026
RRPVSolar Photovoltaic235.0December 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Clenera LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Roadrunner Solar and BESS and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Roadrunner Solar and BESS

Questions about Roadrunner Solar and BESS

How much power does Roadrunner Solar and BESS produce?

Roadrunner Solar and BESS reported 32,947 MWh (32.9 GWh) of net generation in 2025. From January to July 2026 it reported 316 GWh, which is provisional. 1 of 12 months were reported for 2025.

Where is Roadrunner Solar and BESS?

Roadrunner Solar and BESS is in Cochise County, Arizona, at 32.0861, −109.9353. It is in the Western Area Power Administration - Desert Southwest Region balancing area (WALC).

Who operates Roadrunner Solar and BESS?

EIA-860M for August 2026 lists Clenera LLC as the operator (EIA operator ID 60232). The operator is not always the owner.

Is Roadrunner Solar and BESS a solar or a battery storage plant?

Both. Solar capacity totals 235 MW and battery storage capacity totals 235 MW.

When did Roadrunner Solar and BESS start operating?

Its first generator began operating in December 2025, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page