Lincoln Land Wind
Wind power plant in Sangamon County, Illinois. 302 MW of nameplate capacity across 1 generator, operated by Lincoln Land Wind, LLC.
Also known as Lincoln Land · EIA plant 58925
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 302 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2021First generator online
- Operator
- Lincoln Land Wind, LLCEIA operator ID 60569
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Sangamon County, IL39.8219, −89.9558
- EIA plant ID
- 58925EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Lincoln Land Wind produces
Free · EIA-923Net generation, 2025
1.01 TWh
1,005,214 MWh, final
Capacity factor, 2025
38.0%
2024: 40.1%
January to July 2026
638 GWh
Provisional
Range, 2022 to 2025
0.9–1.1
TWh a year. Low 2023, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 212,114 | Not reported | 2 of 12 |
| 2022 | 1,002,489 | 37.9% | 12 of 12 |
| 2023 | 949,341 | 35.9% | 12 of 12 |
| 2024 | 1,064,331 | 40.1% | 12 of 12 |
| 2025 | 1,005,214 | 38.0% | 12 of 12 |
| 2026 (provisional, partial year) | 638,181 | 41.5% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| SAN1 | Onshore Wind Turbine | 302.0 | November 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lincoln Land Wind, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Lincoln Land Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Lincoln Land Wind
Questions about Lincoln Land Wind
How much power does Lincoln Land Wind produce?
Lincoln Land Wind reported 1,005,214 MWh (1.01 TWh) of net generation in 2025, a 38.0% capacity factor on 302 MW of nameplate capacity. From January to July 2026 it reported 638 GWh, which is provisional.
Where is Lincoln Land Wind?
Lincoln Land Wind is in Sangamon County, Illinois, at 39.8219, −89.9558. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Lincoln Land Wind?
EIA-860M for August 2026 lists Lincoln Land Wind, LLC as the operator (EIA operator ID 60569). The operator is not always the owner.
When did Lincoln Land Wind start operating?
Its first generator began operating in November 2021, according to EIA-860M.
Does InfraMap have power prices for Lincoln Land Wind?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Lincoln Land Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page