Story City Wind Project
Wind power plant in Story County, Iowa. 1.5 MW of nameplate capacity across 1 generator, operated by Hamilton Wind Energy LLC.
Also known as Story City Wind · EIA plant 58927
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- October 2010First generator online
- Operator
- Hamilton Wind Energy LLCEIA operator ID 58795
- Grid
- MISOBalancing authority MISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Story County, IA42.2081, −93.5994
- EIA plant ID
- 58927EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Story City Wind Project produces
Free · EIA-923Net generation, 2025
5.16 GWh
5,161 MWh, final
Capacity factor, 2025
39.3%
2024: 38.5%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
2.6–5.8
GWh a year. Low 2023, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | 5,892 | 44.8% | 12 of 12 |
| 2014 | 5,568 | 42.4% | 12 of 12 |
| 2015 | 5,666 | 43.1% | 12 of 12 |
| 2016 | 5,813 | 44.1% | 12 of 12 |
| 2017 | 5,677 | 43.2% | 12 of 12 |
| 2018 | 5,092 | 38.8% | 12 of 12 |
| 2019 | 5,066 | 38.6% | 12 of 12 |
| 2020 | 5,365 | 40.7% | 12 of 12 |
| 2021 | 5,235 | 39.8% | 12 of 12 |
| 2022 | 5,667 | 43.1% | 12 of 12 |
| 2023 | 2,560 | 19.5% | 12 of 12 |
| 2024 | 5,071 | 38.5% | 12 of 12 |
| 2025 | 5,161 | 39.3% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| WT01 | Onshore Wind Turbine | 1.5 | October 2010 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hamilton Wind Energy LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Story City Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Story City Wind Project
Questions about Story City Wind Project
How much power does Story City Wind Project produce?
Story City Wind Project reported 5,161 MWh (5.16 GWh) of net generation in 2025, a 39.3% capacity factor on 1.5 MW of nameplate capacity.
Where is Story City Wind Project?
Story City Wind Project is in Story County, Iowa, at 42.2081, −93.5994. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Story City Wind Project?
EIA-860M for August 2026 lists Hamilton Wind Energy LLC as the operator (EIA operator ID 58795). The operator is not always the owner.
When did Story City Wind Project start operating?
Its first generator began operating in October 2010, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page