WindOperatingISO-NE

Jericho Power

Wind power plant in Coos County, New Hampshire. 14.3 MW of nameplate capacity across 1 generator, operated by Jericho Power LLC.

Also known as Jericho Mountain · EIA plant 59070

Analyst: free account, 1 question a day.

Smith (NH)GorhamBerlin GorhamPontook Hydro FacilityJericho Power10 km
Open in the map
5 plants within 19 km, from EIA coordinates.

Key facts

Capacity
14.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2016First generator online
Operator
Jericho Power LLCEIA operator ID 58891
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Coos County, NH44.4669, −71.2250
EIA plant ID
59070EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Jericho Power produces

Free · EIA-923

Net generation, 2025

22.6 GWh

22,648 MWh, final

Capacity factor, 2025

18.1%

2024: 16.5%

January to July 2026

15.0 GWh

Provisional

Range, 2016 to 2025

11.9–26.5

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201626,485Not reported12 of 12
201726,51121.2%12 of 12
201825,54720.4%12 of 12
201920,09216.0%12 of 12
202025,28420.1%12 of 12
202124,73619.7%12 of 12
202219,15615.3%12 of 12
202311,8619.5%12 of 12
202420,68016.5%12 of 12
202522,64818.1%12 of 12
2026 (provisional, partial year)14,99720.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WT 1Onshore Wind Turbine14.3January 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Jericho Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Jericho Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Jericho Power

Questions about Jericho Power

How much power does Jericho Power produce?

Jericho Power reported 22,648 MWh (22.6 GWh) of net generation in 2025, a 18.1% capacity factor on 14.3 MW of nameplate capacity. From January to July 2026 it reported 15.0 GWh, which is provisional.

Where is Jericho Power?

Jericho Power is in Coos County, New Hampshire, at 44.4669, −71.2250. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Jericho Power?

EIA-860M for August 2026 lists Jericho Power LLC as the operator (EIA operator ID 58891). The operator is not always the owner.

When did Jericho Power start operating?

Its first generator began operating in January 2016, according to EIA-860M.

Does InfraMap have power prices for Jericho Power?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Jericho Power, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page